THERMOSTAHL ECOBIO Скачать руководство пользователя страница 9

BOILER MOUNTING 

 

 

3.2.2.

 

Boiler room dimensions 

The boiler must be placed on a horizontal plane, with adequate mechanical resistance to support 
the boiler’s weight. The boiler must be positioned in the room in such a way so that it is easily 

accessible from all the sides. The following dimensions are recommended (see 0): 

The distance between the boiler and the back wall - 
is  the  proper  distance  that  allows  easy  access  for 

inspection and maintenance. 
The distance between the boiler and side wall - at 
least 0.6 m. 
The height of the boiler room - at least 2 m. 
Access  in  the  boiler  room  of  strangers  to  the 
operation  of  boilers  and  auxiliary  installations  is 

prohibited. 
Access  and  service  spaces  of  boiler  room  and  hall 

doors paths will always be free. 
In  the  boiler  room  will  be  displayed  operating 
instructions, taking into account the specificities of 
the  boilers  mounted.  Also,  you  will  see  internal 

instructions of staff and service duties.  

 

 

Fig 2.

 

Boiler room dimensions 

 

3.3.

 

Chimney  

The  chimney  installation  must  supply  sufficient  draught,  air  tightness  and  protection  against 
condensation. 

The appropriate chimney installation is very important for the boiler’s efficient 
and safe function!  

The chimney must be positioned if possible in the interior of the building. It must be vertical, 
with no changes in the direction. The cross-section of the chimney can be round or rectangular. 
If the chimney is installed in the exterior, it must be insulated.   
 
The horizontal part connecting the boiler’s chimney pipe with the vertical chimney must have 
maximum length 2 m. If this distance is bigger, it is recommended to have a 15-30

o

 inclination 

upwards. The connection with the boiler’s chimney pipe must be air-tight.  
 
The  chimney  must  be  equipped  with  a  cleaning  door  at  its  base.  Also  cleaning  doors  are 
recommended  where  there  are  changes  in  direction  and  ash  can  be  accumulated.  Tactical 
cleaning is recommended (every 3 months) for efficient boiler function.  
A chimney terminal must be installed at the end of the chimney for protection against weather 
effects  and  foreign  objects  entrance.  In  areas  with  strong  winds  a  special  anti-downdraught 
terminal is recommended.   
 
The  chimney  height  must  exceed  the  roofline  by  at  least  1  m.  If  there  are  other  obstacles 
positioned  on  the  roof,  the  chimney  height  must  exceed  them  by  at  least  1  m.  If  there  are 
multiple chimneys, minimum distance between them is 0,3m.  

Содержание ECOBIO

Страница 1: ...MULTIFUEL BIOMASS BOILER ECOBIO INSTALLATION AND USER MANUAL VERSION 2 2 UPDATE 20 08 2017...

Страница 2: ...t automatic ignition 14 5 3 Version with automatic ignition 18 5 4 Connecting exhaust temperature sensor 22 5 5 Connecting temperature sensors 22 5 6 Connecting weather sensor 22 6 BOILER START UP 23...

Страница 3: ...f the appliance unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you resp...

Страница 4: ...or heaters with hot water The boiler is made of steel ideal material for thermal fluctuations resistant to expansion and contraction with two passes of burned gases Also this boiler is protected again...

Страница 5: ...ndle which must always be well tightened during the combustion Fig 1 Boiler function 2 2 2 Furnace The ECOBIO boiler is equipped with the innovative biomass furnace BIOFIRE The system is consisted of...

Страница 6: ...9 kWh kg calorific power and 10 humidity Furnace type ECOBIO 15 30 ECOBIO 40 60 Fan Type RV 12RKs RV 12RK Power W 35 70 Air debit m3 h 170 240 Pressure Pa 280 310 Voltage V Hz 230 50 230 50 Noise leve...

Страница 7: ...power Max diameter Max humidity Ash content kWh kg mm Pellet 4 8 6 8 10 1 Agropellet 4 4 2 6 10 10 5 Coal 5 3 6 5 3 25 15 4 8 Lignite 1 6 3 8 3 25 20 10 Cereals oat 4 2 3 6 10 13 0 6 Wood chips 4 3 5...

Страница 8: ...chnical manual Warranty leaflet 3 2 Boiler room 3 2 1 General requirements The boiler must be installed in a special and separate room This room must be chosen so that it offers easy access for fuel t...

Страница 9: ...priate chimney installation is very important for the boiler s efficient and safe function The chimney must be positioned if possible in the interior of the building It must be vertical with no change...

Страница 10: ...BOILER MOUNTING 10 Each boiler should be connected to an independent chimney Connection of multiple boilers to the same chimney is not recommended Fig 3 Chimney distances Fig 4 Chimney connection...

Страница 11: ...lternative variation is by installing at the return of the boiler a three way thermostatic valve Having a return temperature less than 55o C is very dangerous for the boiler long life and can cause wa...

Страница 12: ...than working pressure 4 4 Automatic ignition system As an optional the furnace can be provided with an automatic ignition system This consists of the following Ignition element 500W Control panel Eco...

Страница 13: ...ssure reducer 17 Drainage valve F Filter 18 Cold water valve A Air relief valve 19 24 One way valves FD Water softener 4 5 2 Closed expansion vessel connection Legend 1 9 Separation valves B Hot water...

Страница 14: ...te circuit The user is obliged to connect the boiler to an efficient grounding system THERMOSTAHL ROMANIA SRL declines any liability for damage caused to people animals and goods due to defects caused...

Страница 15: ...bol 12 Hot utility water temperature sensor 13 Boiler pump symbol 14 Hot utility water pump symbol HUW 15 Boiler temperature sensor 16 Feeder temperature sensor 17 Airflow power 18 Fan operation symbo...

Страница 16: ...ion Terminals 1 10 are intended for connection with low voltage 15V devices Connecting mains supply 230V to terminals 1 10 will damage the regulator and creates risk of an electric shock Legend 1 Cont...

Страница 17: ...after firing the boiler up the central heating pump is activated after the boiler exceeds the central heating pump activation temperature service parameter n0 by default n0 40 C The hot utility water...

Страница 18: ...hot utility water tank HUW M symbol of increasing the preset boiler temperature to fulfill mixer circuit demands P weather control for boiler cycle is active R indicates active return protection 5 Fan...

Страница 19: ...reduced to 10 of the first attempt dose After three unsuccessful attempts an alarm Failed firing up attempt is reported In such case the boiler operation is halted Boiler operation cannot be continued...

Страница 20: ...ELECTRICAL CONNECTIONS 20 5 3 7 Electrical connections...

Страница 21: ...t replace the central heating system design and it can be used for reference purposes only The boiler regulator controls the central heating pump and the hot water pump according to the settings made...

Страница 22: ...eads can be extended with wires with section of at least 0 5mm2 Total length of the sensor leads cannot exceed 15m The boiler temperature sensor CT4 should be fitted in the boiler bulb pipe Hot utilit...

Страница 23: ...ight the boiler make sure the boiler room is clear and safe 6 2 Starting the boiler with wood To correctly start up the ECOBIO boiler follow the next steps Make sure the control panel switch is set to...

Страница 24: ...olding F button Do not leave the regulator in manual operation mode without supervision There is a risk of flame retraction into the feeder and boiler overheat 6 4 Checks to carry after initial start...

Страница 25: ...eeder starts its cycles from the OPERATION TIME OFF break time 6 7 Combustion regulation Biomass fuels vary significantly one from each other For this reason every time a different fuel is used the co...

Страница 26: ...START button is not pressed the device is by default in STOP mode At this mode the device controls only the operation of pumps Fan and feeder are disabled Central heating and HUW pumps operate in acco...

Страница 27: ...move the turbinators from the tubes and clean the tubes with the appropriate tool Afterwards clean the exterior surface of the cylindrical heat exchanger with the exchanger cleaning tool as shown in F...

Страница 28: ...ding is performed freely and the fuel is evenly distributed at the plate surface Check the function of the motoreducer and the fan Clean from dust if needed 7 4 Maintenance intervals 7 4 1 Daily maint...

Страница 29: ...e causes of the overheating If it happens again check the installation and function of the pumps and safety devices 7 5 2 Service after feeder blockage If a blockage occurs to one of the feeders you w...

Страница 30: ...me a certain amount of fuel in the fire chamber which will not stop burning immediately Turn the control panel to OFF When the power is restored turn on the control panel and make sure all the devices...

Страница 31: ...of the furnace after the heating season The maintenance of the furnace should only be done when the boiler is stopped cool and the power deactivated For easier maintenance it is recommended to leave a...

Страница 32: ...the boiler but low temperature at the radiators too high hydraulic resistance in the heating network thermostatic mixing valve is connected wrong increase the pump speed check replace the mixing valve...

Страница 33: ...zeaz combustibili solizi cu nc rcare manual i automat cu puterea util mai mic sau egal cu 500 kW Terminologie cerin e ncercare i marcare Heating boilers Part 5 Heating boilers for solid fuels hand and...

Страница 34: ...THERMOSTAHL ROMANIA HEATING SYSTEMS S R L DRUMUL OSIEI 57 59 sector 6 Bucharest 062395 Romania www thermostahl ro...

Отзывы: