![THERMOROSSI ECOTHERM COMPACT 25 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/thermorossi/ecotherm-compact-25/ecotherm-compact-25_installation-use-and-maintenance-manual_1106076010.webp)
pg. X
V
IT
E
T
C
+
4
,8
X
1
3
(2
p
z
.)
G
VITE TC+ 4,8X13 (2 pz.)
F
H
VITE TC+ 4,8X13
(2 pz.)
E
VITE TC+ 4,8X13 (2 pz.)
D
VITE TC+ 4,8X13 (4 pz.)
A
B
VITE TC+ 4,8X13 (4 pz.)
VITE TC+ 4,8X13 (2 pz.)
VITE TSP+ 8X50
+ DADO (4 pz.)
C
B1
H
F
I
After having mounted the additional
hopper fasten the hopper to the boiler:
- Remove the octagonal portion of precut
sheet metal from the side (F) of the
boiler
- Remove the cap (I) from the hopper by
undoing the screws fastened to it.
- Move the additional tank up against the
boiler by adjusting the mounting feet (H)
until the assembly is satisfactory.
- Fasten the assembly using the screws
previously removed from the cap (I).
4 . 2 . 5
4 . 2 . 5
4 . 2 . 5
4 . 2 . 5
4 . 2 . 5
HO
HO
HO
HO
HOW
W
W
W
W T
T
T
T
TO F
O F
O F
O F
O FASTEN
ASTEN
ASTEN
ASTEN
ASTEN THE
THE
THE
THE
THE ADDITION
ADDITION
ADDITION
ADDITION
ADDITIONAL HOPPER (OPTION
AL HOPPER (OPTION
AL HOPPER (OPTION
AL HOPPER (OPTION
AL HOPPER (OPTIONAL)
AL)
AL)
AL)
AL) T
T
T
T
TO COMP
O COMP
O COMP
O COMP
O COMPA
A
A
A
ACT BOILER.
CT BOILER.
CT BOILER.
CT BOILER.
CT BOILER.
To increase the boiler's autonomy of operation it is possible to install one or two additional hoppers at the sides of the boiler. Each additional
hopper can hold up to 100 Kg of pellets.
Firstly unpack the hopper then assemble it as follows:
- Fasten the 4 telescopic legs (A) using the screws provided (screws TSP+ 8x50).
- Fasten the pellet chute (attention: use chute B) to the hopper using the screws provided (screws TC+4.8x13).
- Mount the panel (C) by inserting the bottom folds on the holes of the hopper, and then securing it using the screws provided (screws
TC+4.8x13).
- Similarly fasten the panel (E) using the screws provided (screws TC+4.8x13).
- Then mount the panel (D) by lining up the lower rectangular holes on the panel folds (E) and fastening them using the screws provided
(screws TC+4.8x13).
- The panels (D) and (E) can be mounted either to the right or to the left of the pellet chute (B); if mounted on the right the additional hopper
will have to be mounted to the right of the boiler. .
- Fix the panel (G) by firstly inserting the holes on the bottom on the mounting feet then securing them with the screws provided (screws
TC+4.8x13).
- Next mount the panel (F) by inserting the bottom folds on the holes in the panel (G).
4 . 2 . 4
4 . 2 . 4
4 . 2 . 4
4 . 2 . 4
4 . 2 . 4
HO
HO
HO
HO
HOW
W
W
W
W T
T
T
T
TO INST
O INST
O INST
O INST
O INSTALL
ALL
ALL
ALL
ALL ADDITION
ADDITION
ADDITION
ADDITION
ADDITIONAL HOPPER (OPTION
AL HOPPER (OPTION
AL HOPPER (OPTION
AL HOPPER (OPTION
AL HOPPER (OPTIONAL)
AL)
AL)
AL)
AL) WITH COMP
WITH COMP
WITH COMP
WITH COMP
WITH COMPA
A
A
A
ACT BOILER.
CT BOILER.
CT BOILER.
CT BOILER.
CT BOILER.
K E Y
Screw
Nut
LEGENDA
Vite
Dado