4
6.
Cut off end of cable.
7.
Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions.
9.
For power connection applications: Use
dimple molded into side of junction box base
to locate center of hole, drill for user supplied
power connection fittings per manufacturer’s
recommendations.
10.
Mount junction box base on expediter. Make
sure to align slots to properly orient junction
box base. Tighten nut securely.
11.
For power connection applications: Install
power connection fittings (user supplied) and
pull in power and ground wires.
12.
Install quick mount terminal blocks.
13.
Complete system wiring. Refer to typical wiring
details. Tightening torque 1.5 Nm–1.8 Nm
(1.1 ft-lb–1.3 ft-lb).
8.
Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion loop
to pipe.
Terminator DL