background image

4

6. 

Cut off end of cable. 

7. 

Terminate  cable  with  appropriate  PETK 

termination  kit.  Refer  to  PETK  installation 

instructions.

9. 

For  power  connection  applications:  Use 

dimple molded into side of junction box base 

to locate center of hole, drill for user supplied 

power connection fittings per manufacturer’s 

recommendations.

10. 

Mount junction box base on expediter. Make 

sure to align slots to properly orient junction 

box base. Tighten nut securely.

11. 

For  power  connection  applications:  Install 

power connection fittings (user supplied) and 

pull in power and ground wires.

12. 

Install quick mount terminal blocks.

13. 

Complete system wiring. Refer to typical wiring 

details.  Tightening  torque  1.5  Nm–1.8  Nm 

(1.1 ft-lb–1.3 ft-lb).

8. 

Push  excess  cable  back  through  expediter. 

Tighten cap securely. Tape cable expansion loop 

to pipe.

Terminator DL

Отзывы: