2
IP66/Type 4X -60°C ≤ Ta ≤ +55°C
Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C, & D, Zone 2 IIC
Class II, Division 2, Groups F & G, Class III
Listed Heat Tracing Cable System 137M
Kit Contents
Tools Required
Receiving, Storing and Handling
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper
type and quantity has been received.
Dimensions
Certifications/Approvals
Item
Quantity
Description
1
1
RTV Tube
2
1
Power Connection Boot
3
1
End Cap
4
1
Tape Strip Teflon 6" (PETK-3D only)
5
1
End Termination Caution Label
6
1
GRW-G Grommet (PETK-3D only)
7
1
Ground Sleeve
Order Separately
PETK Power and End Termination Kits (per cable)
PETK-1D
for BSX, RSX, VSX-HT
PETK-2D
for KSX, HTSX
PETK-3D
for HPT, FP
Item
Quantity
Description
1
1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Junction Box Lid with Lens
3
1
Junction Box Base with O-Ring
4
1
Nut
5
1
Banding
6
1
Banding Guide
7
1
Lamp Terminal Blocks with DIN Rail
(Refer to terminal block specifications for
maximum allowable wire size)
8
1
Junction Box Cord
Installation Precautions
• To minimize the potential for arcing and fire caused by product
damage or improper installation use ground-fault protection.
The National Electrical Code (NEC) and Canadian Electrical
Code (CEC) require ground-fault protection of equipment for
each branch circuit supplying electric heat tracing.
• Installation must comply with Thermon requirements and
be installed in accordance with the NEC, CEC, or any other
applicable national and local codes.
• Component approvals and performance ratings are based on
the use of Thermon specified parts only. User supplied power
connection fittings must be listed or certified for intended use.
• De-energize all power sources before opening enclosure.
• Keep ends of heating cable and kit components dry before and
during installation.
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper personal protective equipment, or PPE, should be
utilized during installation. Contact Thermon if you have any
additional questions.
Terminator DL
1
2
6
4
3
8
5
7
1
2
6
4
3
5
7