background image

17

Barnstead/Thermolyne 1-800-553-0039

q.

Re-lnsert elements from the front towards the back. Insert the bottom element first, then the
sides, and the top element last. (Make sure elements are flush and are approximately one inch
from door opening.)

r. 

Re-insert back piece of insulation over element leads and insulated porcelain bushings.

s.

 Replace back terminal plate over element leads with the six screws.

t. 

Reconnect the yellow wire to the positive terminal and the red wire to the opposite terminal
(negative). Insert thermocouple and fasten the lead tagged positive (+) to the positive terminal
and the other lead to the opposite terminal (negative).

u. 

Bend the element leads across the "U" shaped terminal clamp washer and secure with a washer
and nut. (SEE Figure 2.)

v. 

Fasten the short white insulated wire to terminal two (T2) and the longer one to terminal one (T1).
(SEE Figure 2.)

w. 

Replace the back terminal cover with four screws.

x. 

Reconnect the furnace to power supply.

y. 

Test operation of furnace.

6-9. 

To Replace Door Switch (Micro Switch):

a. 

Disconnect furnace from power supply.

b. 

Turn furnace upside down and remove bottom plate with four screws. (Note connection and
placement of wires to micro switch.)

c. 

Disconnect the wires from door switch. Identify or mark wires disconnected to insure proper
p/acement and connection when reinstalling.

d. 

Remove two screws from micro switch and slide switch off the wire rod.

e. 

Insert new door switch while sliding it over the wire rod.

f. 

Reconnect wires identified or marked in Step c to new door switch.

g. 

Replace bottom cover and secure with four screws.

h. 

Turn furnace upright and reconnect to power supply.

i. 

Test operation of door switch.

6-10. To Realign Door Switch:

a. 

Disconnect furnace from power supply.

b. 

Loosen set screw on cam and adjust it so that the power is removed when approximately a 15°
movement is made with the door handle. (When opening the door.)

c. 

Tighten set screw on adjusting cam.

d. 

Reconnect furnace to power supply.

e. 

Test operation of door switch.

Содержание FC2020P

Страница 1: ...0 Furnace OPERATION MANUAL AND PARTS LIST Series 326 BARNSTEAD THERMOLYNE CORPORATION MODEL NUMBERS FC2020P FC2020P 1 FC2024P FC2024P 1 FC2025P FC2025P 1 FC2028P FC2028P 1 READ ALL WARNINGS CAUTIONS A...

Страница 2: ...January 1990 LT326X1...

Страница 3: ...ior to the use of this equipment TABLE OF CONTENTS SAFETY INFORMATION 1 SIGNAL WORDS 1 WARNINGS 1 INTRODUCTION 2 GENERAL SPECIFICATIONS 5 UNPACKAGING 7 INSTALLATION 7 OPERATION 8 PREVENTIVE MAINTENANC...

Страница 4: ...ALLED BY A COMPETENT QUALIFIED ELECTRICIAN WHO INSURES COMPATIBILITY AMONG FURNACE SPECIFICATIONS POWER SOURCE AND GROUNDING CODE REQUIREMENTS 2 ALWAYS BE DISCONNECTED FROM THE POWER SUPPLY PRIOR TO M...

Страница 5: ...F 982 C to 2000 F 1093 C for intermittent use High temperature 1 models are intended for applications requiring temperatures from 400 F 204 C to 1950 F 1066 C for continuous use or temperatures from...

Страница 6: ...3 Barnstead Thermolyne 1 800 553 0039 Figure 1...

Страница 7: ...4 Figure 2...

Страница 8: ...50 60 50 60 50 60 50 60 Phase 1 1 1 1 Operating Temperature Cont 1800 F 982 C 1800 F 982 C 1800 F 982 C 1800 F 982 C Inter mittent 2000 F 1093 C 2000 F 1093 C 2000 F 1093 C 2000 F 1093 C NOTES Not su...

Страница 9: ...60 50 60 Phase 1 1 1 1 Operating Temperature Cont 1950 F 1066 C 1950 F 1066 C 1950 F 1066 C 1950 F 1066 C Inter mittent 2150 F 1177 C 2150 F 1177 C 2150 F 1177 C 2150 F 1177 C NOTES Not supplied with...

Страница 10: ...e 2000 furnace to your electrical supply be sure the two position power switch is in the OFF position WARNING TO AVOID ELECTRICAL SHOCK THIS FURNACE MUST BE INSTALLED BY A COMPETENT QUALIFIED ELECTRIC...

Страница 11: ...ntermittently The controller then automatically maintains chamber temperature at the desired setting To turn the furnace off turn power switch to the OFF position WARNING TO AVOID BURNS THIS FURNACE M...

Страница 12: ...should consult the appropriate Material Safety Data Sheets MSDS s for such products with respect to proper handling and appropriate protective equipment For additional MSDS s or additional informatio...

Страница 13: ...240V furnace are burned out 6 Two or more heating elements in a 120V or 100V furnace are burned out 7 Door switch malfunction 1 Check power source and fuse 2 Repair electrical hookup 3 Replace thermoc...

Страница 14: ...perly 1 Keep furnace under maximum temperature Closer supervision of control setting 2 Enclose material in container Clean up spills in chamber Ventilate chamber by leaving door cracked slightly open...

Страница 15: ...Accordingly before you repair or replace any insulating materials or perform any other servicing on this product which could disturb or cause exposure to dust from insulating materials you should cons...

Страница 16: ...pproximately 1 8 of the ceramic insulators remains outside the furnace back A polarity test of the thermocouple and lead wire is easily made with the use of a magnet On Chromel Alumel thermocouples an...

Страница 17: ...r orange yellow brown from top to bottom i Turn the potentiometer shaft fully counterclockwise and slide the knob over the shaft j Secure knob onto shaft with two Allen set screws making sure the line...

Страница 18: ...ement of wires d Disconnect the necessary wires from front control plate to enable it to be removed Identify or mark wires disconnected to insure proper placement and connection when reinstalling e Re...

Страница 19: ...emove the four elements by pulling each element through the front of the furnace The top element is usually the easiest to remove first g Remove back cover with its six screws to expose insulation h F...

Страница 20: ...cover with four screws x Reconnect the furnace to power supply y Test operation of furnace 6 9 To Replace Door Switch Micro Switch a Disconnect furnace from power supply b Turn furnace upside down and...

Страница 21: ...18 Figure 3 Exploded View...

Страница 22: ...ment Side for Model FC2024P 2 required Element Side for Model FC2028P 2 required Element Side for Models FC2020P 1 and FC2025P 1 2 required Element Side for Model FC2024P 1 2 required Element Side for...

Страница 23: ...421 B torque to 30 in for 100 120V Models Semi conductor T6421D torque to 30 in for 208 240V Models Connector Assembly Insulator 12 required Insulator 6 required Terminal 6 required Fastener washer 6...

Страница 24: ...21 Barnstead Thermolyne 1 800 553 0039 Figure 4 Wiring Diagram...

Страница 25: ...ve high temperature or contamination warranty replacement will be provided Barnstead Thermolyne s sole obligation under this warranty shall be to repair or replace any products which it delivers and a...

Отзывы: