During assembly and installation of the boiler, the regulations and
laws rules of the state in which the boiler is installed must be
considered.
The assembly and installation can only be performed by qualified
personnel.
The heating installation must be calculated by professionally.
The Schronstein and the exhaust pipes must expects professionally
built and placed the law directives.
Storing pellets dry.
In certain countries, the emissions shall be measured after the
commissioning of the furnace.