Test
Procedures
OQ/PQ Operating Instructions
M1393R0
Page 27 of 60
4.5
UltiMate Fluid Path Test
The UltiMate fluid path test is used to check the solenoids and the solvent delivery.
4.5.1
Performing the Test
a)
Fill each solvent bottle until the fluid level corresponds to the top of the UltiMate
housing with the solvents specified in TABLE 3-4.
b)
Degas all solvents properly and purge all solvent channels.
c)
Disconnect the solvent inlet line from the pump head and connect the 250 µl syringe
(P/N 163241, the plunger should be removed) using an adapter (P/N 160259) as
presented in FIGURE 4-4.
FIGURE 4-4
Placing the Syringe on the Solvent Inlet Line
d)
Enter the purge screen of the micro pump, set the flow rate to 0.0 ml/min and select
channel A. The LED of channel A should be illuminated
e)
Measure the flow rate for one minute. The flow rate should be greater than
0.15 mL/min
f)
Repeat steps d) – e) for solvent channels B, C and D.
g)
Switch off the pump. The flow should stop immediately.
h)
Verify the result with the limits presented in TABLE 2-3 and fill in the appropriate field
in the ‘Other Tests’ page of the QO/PQ report.