Section 2
Introduction
10
Thermo Scientific Orion
2230XP Silica Analyzer
NOTE:
The analyzer may be shipped with a translucent protective cover on the
LCD. Carefully peel off this translucent layer and discard it.
WARNING
DO NOT APPLY ELECTRICAL POWER TO VISIBLY DAMAGED
COMPONENTS, AS INJURY OR FURTHER EQUIPMENT DAMAGE MAY
OCCUR .
Startup Procedure
This section describes the necessary steps to begin using the 2230XP Silica Analyzer. Refer to
Section 3 for instructions on mounting the analyzer, making the plumbing connections, and
connecting electrical power. More details can be found in subsequent chapters.
Once the analyzer is securely mounted in a fixed location, wired to electrical power, wired to
communications, (if necessary) and plumbed to process water, perform the following instrument
Startup Procedure:
1.
Power on instrument.
2.
To allow longer lifetime of unit, the pinch valve and pump-head tubing are not fully engaged
when the unit is shipped. Refer to
Plumbing Connections
Section.
a.
Reset tubes in pumps heads.
Note:
This step must be repeated for all three pump heads.
i.
Remove tape.
ii.
Slide tube retainer into place along keyway.
iii.
Install tubing cover by squeezing both sides, and sliding into grooves.
b.
Rest rear tubing in pinch valves.
Note:
Be sure tubing is properly seated and does not pinch.
3.
Install Reagents. Very carefully match reagent numbers and colors in their proper order.
Refer to next page,
Installing the Reagents Section
.
NOTES:
It is recommended to wear latex gloves whenever handling or changing
reagents.
Turn the reagent cap clockwise while holding bottle vertical and level.
Inspect the tubes to be sure none have been pinched.
4.
Prime the tubing. Please repeat the following sequence 3 times. (See
Installing the
Reagents Section
)
a.
Press
Menu
.