Appendix
42
Thermo Scientific
PART 2: Installation qualification
Items included
N/A
YES
NO
(*
Items ordered separately
It is possible to order Thermo Scientific consumables separately. For more information, refer to
on
page 35.
Approved by:
Customer's name:
Place:
Date:
Signature:
Comments:
Vendor rep.'s name:
Place:
Date:
Signature:
Comments:
(*
If something is missing, the item will be sent by the vendor who will confirm the delivery date.
PART 3: Operational qualification
N/A
YES
NO
1. Analyzer visual check
All parts are undamaged
Comments:
2. If applicable, install the electrodes.
For more information about electrodes, refer to
Comments:
3. System powered up
Analyzer and workstation gets power
Comments:
4. Reagent disk cooling * set to ON/OFF configuration/analyzer
ON = default OFF = cooling disconnected
Comments:
ON
OFF
5. Probe(s) and mixer position check done
Содержание Gallery Plus
Страница 1: ......
Страница 6: ...vi Thermo Scientific Figure 2 Safety labeling inside analyzer ...
Страница 12: ... this page was intentionally left blank ...
Страница 18: ... this page was intentionally left blank ...
Страница 26: ... this page was intentionally left blank ...
Страница 44: ...4 Setting up Setting up 26 Thermo Scientific 7 Connect the workstation s power cable ...
Страница 47: ...A Thermo Scientific 29 Removing transport casing ...
Страница 48: ... this page was intentionally left blank ...
Страница 52: ... this page was intentionally left blank ...
Страница 56: ... this page was intentionally left blank ...