1. Carefully position the spectrometer on top of the rack with the feet aligned over the drilled holes.
2. Insert the four (4) screws upward from underneath the top of the rack into the four feet of the spec-
trometer.
3. Tighten each of the screws completely.
4. Complete the assembly according to the installation guide that came with your spectrometer.
If your system uses a Manual Pressure Control system, proceed to step 3: install the pumps and
additional filters.
If your system uses an automatic pressure control system, turn to
"The Automatic Pressure Control
Thermo Scientific
Modular Gas System User Guide
15
Installation
Содержание FTIR
Страница 1: ...Modular Gas System USERGUIDE 269 346401B July 2022 ...
Страница 15: ... This page intentionally left blank ...
Страница 38: ...using the pressure transducer Thermo Scientific Modular Gas System User Guide 33 Installation ...
Страница 61: ... This page intentionally left blank ...
Страница 79: ... This page intentionally left blank ...
Страница 81: ...Plumbing diagrams Automatic Pressure Control System 76 Modular Gas System User Guide Thermo Scientific ...
Страница 82: ...Eductor Panel Thermo Scientific Modular Gas System User Guide 77 Plumbing diagrams ...
Страница 83: ... This page intentionally left blank ...