![Thermo Scientific Barnstead Pretreatment System Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/thermo-scientific/barnstead-pretreatment-system/barnstead-pretreatment-system_installation-and-operation-manual_1104977011.webp)
Pretreatment system
The Installation Area | 7
The Installation Area
Note:
The operator is obliged to ensure, that the installation of
the pretreatment system and its operation are carried out in
compliance with all national and international guidelines,
applicable and valid for the place of installation.
Note:
If necessary, measures to protect the water have to be
taken by installing appropriate components.
Take the following criteria into consideration when selecting
the installation area:
•
Feed-water pressure (potable tap water) not be less than
2 bar (29 PSI) and not greater than 6.9 bar (100 PSI).
•
There must be a feed-water shut off valve installed ahead
of the Smart2Pure Pro system.
•
You must protect your system from frost. The
temperature at the installation area must be between
+2°C and +40°C.
•
The surface on which the system is installed must be
level and stable. It should not exceed a maximum of 2%
deviation from evenness is recommended.
•
A smooth wall is required when the system is to be wall
mounted. The bench or wall surface must have an
adequate load-carrying capacity (check the maximum
capacity of load the wall can sustain and the stability of
the wall). The dry and wet weight of the system is given
under section
Technical Specifications
.
•
A low pressure check valve is recommended in the
feed-water line to prevent back flow of feed-water from
the water system. Refer to local building codes.
•
Easy access for operation and control of the system.
CAUTION:
The feed-water pressure to
Pretreatment system must not be allowed to go
above 6.9 bar. Install an additional pressure
reducer when the feed-water pressure is higher.