Power instrument "On"
1.
Insert the power cord to instrument and a 100-240V outlet.
2.
Switch on using the mains IEC switch at the rear side of the instrument
1
1
Power button
3.
The instrument will be initialized by itself, which will take ~90 seconds
Power instrument "Off"
Switch off using the mains IEC switch at the rear, right side of the instrument.
1
1
Power button
CAUTION!
There is no automatic recovery procedure. If a loss of power event has occurred, see
.
Chapter 2
Installation and setup
Power instrument "On"
2
32
CTS
™
DynaCellect
™
Magnetic Separation System User Guide
Содержание A55867
Страница 197: ......