All installations and services must be performed by qualified service personnel.
11
COMBUSTION AND EFFICIENCY TESTING FOR
OIL FIRED CENTRAL FURNACES.
Complete this form for each furnace installed. Read instruction
CUSTOMER
NAME
ADDRESS
CITY, STATE
HEATING
SYSTEM
BURNER
MODEL
NO.
AIR SHUTTER OPENING
INS.
% OF MAX. (EST)
FURNACE
MODEL
TYPE OF VENTING SYSTEM
MASONRY
CHIMNEY
METAL
CHIMNEY
SIDEWALL
POWER VENTER
MASONRY
CHIMNEY
W/INDUCER
METAL
CHIMNEY
W/INDUCER
MASONRY CHIMNEY
W/METAL LINER
FUEL LINE FILTER
DRAFT CONTROL
COMBUSTION
TESTS
(Operate burner
at least 10
minutes before
CO2 in stack pipe
INITIAL
SERVICE
SERVICE
SERVICE
INSTALLATION
Draft Over-fire
Draft in stack pipe
Smoke number
Furnace room temp.
Gross stack temp.
Net stack temp.
(Gross stack minus
furnace room temp.)
Efficiency
Nozzle size and spray
Date
NOTES:
INSTALLER NAME & ADDRESS
manual carefully before making tests. Retain this form with furnace.
furnace.
BLAST TUBE LGTH.
Tests taken by
starting tests.)
COMBUSTION
CHAMBER
CONDITION
MATERIAL
FURNACE SERIAL NUMBER
Oil pump pressure
Operation of Controls
Burner Safety Controls
Check for oil leaks
Содержание Spirit VHF-ABE
Страница 16: ...All installations and services must be performed by qualified service personnel 13...
Страница 17: ...All installations and services must be performed by qualified service personnel 14...
Страница 18: ...All installations and services must be performed by qualified service personnel 15...
Страница 20: ...All installations and services must be performed by qualified service personnel 17...