68
Maintenance Inspection Schedule
A closely followed maintenance program will help to keep
your Thermo King unit in top operating condition. The
following general schedule is provided to assist in monitoring
that maintenance.
For more specific detail, see the maintenance manual for your
unit and to the PreTrip Inspection chapter in this manual.
After first week of operation:
•
Check belt tension.
•
Tighten unit mounting bolts.
•
Check coolant level.
•
Check refrigerant oil level.
•
Check refrigerant level.
Pretrip
750
Hours
Annual
2,000
Hours
Inspect/Service These Items
Microprocessor
•
Run pretrip test (see “Pretrip Test” in Operating Instructions Chapter).
TK380U Engine
•
Check fuel supply.
•
Check engine oil level.
Содержание UT-1280
Страница 2: ......
Страница 3: ...Copyright 2016 Thermo King Corp Minneapolis MN USA Printed in USA UT 1280 TK 56373 1 OP Rev 0 10 16...
Страница 14: ...Safety Precautions 12 Figure 6 High Voltage Caution Located near high voltage box...
Страница 29: ...Unit Description 27 Unit Component Identification Figure 12 UT 1280 Front View...
Страница 82: ......