58
Battery Connections
Important Battery Information
IMPORTANT: See Safety Precautions - “Battery Installation and Cable
Routing” on page 7 for additional information.
NOTE: Thermo King units are designed for one 12 volt, group 31
battery. The battery must be suitable for deep cycling, heavy duty
and rated with a minimum of 95 amp/hr.
Positive Cable
1. At the unit, locate the large black cable marked POS+. Route this cable
to the battery, cut to the proper length and add battery cable lug from
installation kit (Detail A). This cable will be attached to the battery in
Step 2.
Unit Control Power Wire
2. At the unit, locate the large 8 AWG (#2) wire. Route this wire to the
battery, cut to the proper length and add fuse holder assembly.
•
Use battery cable crimper to securely crimp 8 AWG (#2) wire and
fuse holder together and heat shrink the connection.
•
Apply a liberal amount of Superlube to the 60 amp fuse and fuse
holder and then install fuse.
•
Route the fuse holder terminal along with the positive cable
(POS+) into the battery box through the rubber grommet and
connect to the POSITIVE terminal of the battery (Detail A).
Fuel Pump Harness
3. Route and connect the fuel pump harness to the fuel pump.
Negative Cable
4. At the unit, locate the large black cable marked NEG -. Route this cable
to the battery, cut to the proper length and add the battery lug from
installation kit.
•
Route the negative cable (NEG -) into the battery box through the
rubber grommet and connect to the NEGATIVE terminal of battery
(Detail B).
5. Install the battery box cover securely.
6. All harnesses and battery cables should be neatly routed and secured
with provided clamps.
Содержание T-1000M
Страница 2: ......
Страница 5: ...3 Installation Manual for T Series Systems ...
Страница 12: ...10 Service Area T 580R T 600R T 680R T 680R T 680S T 800M T 800R T 880R T 880S ...
Страница 13: ...11 Service Area T 1000M T 1000R T 1080R T 1080S and T 1200R ...
Страница 14: ...12 Remote Power Receptacle Dimensions OPTION NORTH AMERICAN MODELS INTERNATIONAL MODELS ...
Страница 15: ...13 Battery Box Dimensions OPTION ...
Страница 16: ...14 Remote Status Light Dimensions OPTION ...
Страница 17: ...15 HMI Controller Dimensions HMI Controller LED Display HMI Controller Graphics Display ...
Страница 25: ...23 Required Tools ...
Страница 27: ...25 Installation Components ...
Страница 29: ...27 Uncrating the Unit ...
Страница 31: ...29 Installing the Unit ...
Страница 33: ...31 Installing the Hose Management Caps Cutout Guide Marks Front of Unit ...
Страница 35: ...33 Installing the Hose Management System OPTION Front of Unit ...
Страница 39: ...37 Securing the Evaporator Drain Hoses ...
Страница 41: ...39 Installing the Fuel Pickup Tube Into a Steel or Aluminum Tank ...
Страница 43: ...41 Installing the Fuel Pickup Tube Into a Plastic Tank ...
Страница 45: ...43 Installing the Steel Fuel Tank 1 2 3 4 ...
Страница 47: ...45 Installing the Aluminum Fuel Tank OPTION 1 2 3 4 ...
Страница 49: ...47 Installing the Fuel Pump and Fuel Lines ...
Страница 51: ...49 Installing the ServiceWatch Remote Download Port ...
Страница 53: ...51 Installing the Remote Power Receptacle OPTION ...
Страница 55: ...53 Installing the Remote Status Light OPTION ...
Страница 57: ...55 Installing the HMI Controller NOTE HMI with LED Display shown HMI with Graphics Display installs the same ...
Страница 59: ...57 Installing the Battery Box OPTION ...
Страница 61: ...59 Battery Connections ...
Страница 63: ...61 Installing the Door Switch OPTION Right Angle Mounting Top x Top Mounting Side x Side Mounting ...
Страница 69: ...67 ...
Страница 70: ......