![Thermo King Super II SR+ Скачать руководство пользователя страница 91](http://html.mh-extra.com/html/thermo-king/super-ii-sr/super-ii-sr_manual_1104381091.webp)
81
Refrigeration Service Operations
NOTE: It is generally good practice to replace the filter drier whenever the high side is opened or when the low side is
opened for an extended period of time.
Removal
1.
Pump down the low side and equalize the pressure to
slightly positive.
2.
Front seat the discharge and suction service valves.
Recover the remaining refrigerant pressure from the
compressor.
3.
Unbolt the discharge and suction service valves from
the compressor.
4.
Disconnect the high pressure cutout switches and the
pilot solenoid line.
5.
Support the compressor and remove the compressor
mounting bolts from the flywheel housing.
6.
Lift the service valves out of the way.
7.
Slide the compressor to the left until the coupling pins
are clear.
8.
Remove the compressor from the front of the unit.
Keep the compressor ports covered to prevent dust,
dirt, etc., from falling into the compressor.
NOTE: When the compressor is removed from the
unit, the oil level should be noted, or the oil removed
from the compressor should be measured so that the
same amount of oil can be added before placing the
replacement compressor in the unit.
Installation
1.
Slide the compressor into the unit.
2.
Place the compressor in position and install the mount-
ing bolts.
3.
Install the service valves using new gaskets soaked in
compressor oil. Connect the high pressure cutout
switch and the pilot solenoid valve line.
4.
Pressurize the compressor and test for refrigerant leaks.
5.
If no leaks are found, evacuate the compressor.
6.
Back seat the suction and discharge service valves.
7.
Operate the unit at least 30 minutes and then inspect the
oil level in the compressor. Add or remove oil if neces-
sary.
8.
Check the refrigerant charge and add refrigerant if
needed.
CONDENSER COIL
Removal
1.
Recover the refrigerant charge.
2.
Remove the top screen.
3.
Remove the mounting bolts.
4.
Unsolder the inlet line and liquid line connections. Lift
the coil from the unit.
Installation
1.
Clean the fittings for soldering.
2.
Place the coil in the unit and install the mounting bolts.
3.
Solder the inlet line and liquid line connections.
4.
Pressurize the refrigeration system and test for leaks. If
no leaks are found, evacuate the system.
Содержание Super II SR+
Страница 4: ......
Страница 10: ...ii ...
Страница 14: ...4 ...
Страница 22: ...Unit Description Rev 6 98 12 Front View AEA1350 ...
Страница 23: ...Unit Description Rev 6 98 13 Right Side Door Open AEA1351 ...
Страница 24: ...Unit Description Rev 6 98 14 Left Side Doors Open AEA1352 ...
Страница 26: ...Operating Instructions Rev 6 98 16 Control Box Cover AEA1354 ...
Страница 34: ...24 ...
Страница 42: ...Electronic Controls Rev 6 98 32 SOFTWARE REVISION 04XX ALARMS AEA1358 ...
Страница 82: ...72 ...
Страница 90: ...80 ...
Страница 116: ...106 ...
Страница 120: ...110 ...
Страница 130: ...120 ...
Страница 141: ...131 Schematic Diagram SBIII SII RMNII 30 SR MPIV ...
Страница 142: ...132 Wiring Diagram SII SBIII RMN30 SR MPIV Page 1 of 4 ...
Страница 143: ...133 Wiring Diagram SII SBIII RMN30 SR MPIV Page 2 of 4 ...
Страница 144: ...134 Wiring Diagram SII SBIII RMN30 SR MPIV Page 3 of 4 ...
Страница 145: ...135 Wiring Diagram SII SBIII RMN30 SR MPIV page 4 of 4 ...