16
12. Connect the cable from the solar panel.
NOTE: Always ensure the solar panel fuse (located on the terminal connection harness) is removed during
installation and service.
13. Connect the Fused cable to the Charge Controller.
BEN365
NOTE: After installation is
complete, it is advisable to coil up
any extra length of the Item 2
extension cable and secure with
cable tie. See “Routing Illustration
SLXi DRC” on page 17.
Item 2
BEN142
Item 4
Содержание Ingersoll Rand NAD 100W
Страница 2: ...2 BEN137 ...
Страница 20: ...20 Figure 3 Testing Connections BEN147 ...