36
ENGLISH
INSTALLER
SUNDAY 200
boilers incorporate a CH system fill cock.
b
Make sure that the system filling cock (2) is closed
before you start to fill or drain the system.
FILLING THE STORAGE CYLINDER
- Make sure that the central heating circuit and storage
cylinder drain cocks (4) and (3) are closed.
- Open a DHW user tap.
- Open the DHW circuit shut-off cocks and slowly fill the
storage cylinder until clean, air-free water flows out from
the taps in a uniform manner.
FILLING THE CENTRAL HEATING SYSTEM
- Make sure that CH system fill cock (4) is closed.
- Slacken off the cap of the automatic vent valve (1) to let
air out of the system.
- Slacken off the cap of the manual bleed valve (5). Close
the valve again as soon as water starts to come out.
- Open the CH system fill cock (2) and slowly fill the
system until the pressure gauge (7) reads out a value
between
1 and 1.2 bar
.
- Close the CH system fill cock (2). Tighten down the cap
on the manual vent valve (5).
b
Bleed the central heating circuit thoroughly to
ensure that no air remains in it (see page 51).
b
The drain points on the solar circuit safety valves
must also be connected to a suitable collection and
drain system.
b
The manufacturer declines all responsibility for
damage caused by water escaping from the safety
valves.
20
40 60 80
100
4
3 2 1
0
0
120
7
FILLING AND DRAINING THE SYSTEM
1
2
3
5
4
Содержание 20105840
Страница 1: ...SUNDAY 200 SOL INSTALLATION AND MAINTENANCE MANUAL...
Страница 58: ...58 ENGLISH TECHNICAL ASSISTANCE SERVICE...
Страница 59: ...59 ENGLISH TECHNICAL ASSISTANCE SERVICE...