22
ENGLISH
INSTALLER
Once you have removed the packaging, proceed as fol-
lows to handle and move the boiler.
- Unscrew the 4 screws (A) shown in the figure and
remove the boiler from the pallet.
- Remove the front panel (1) to facilitate handling and
movement of the boiler.
- Grip the boiler at points (B) and tilt it backwards, then
grip it at points (B) and (C) to lift it. An optional han-
dling bracket kit is available to provide a better grip
at points (B).
b
Do not lift the boiler by its casing but only by
rigid parts such as its base and top frame.
b
Wear suitable personal protective equipment
and use suitable safety devices.
a
Do not dispose of packaging material into the envi-
ronment, or leave it within the reach of children,
since it can become a potential hazard. Dispose of
packaging material in compliance with applicable
legislation.
A
A
1
B
B
C
C
LIFT
OPEN
TILT
HANDLING
Содержание 20105840
Страница 1: ...SUNDAY 200 SOL INSTALLATION AND MAINTENANCE MANUAL...
Страница 58: ...58 ENGLISH TECHNICAL ASSISTANCE SERVICE...
Страница 59: ...59 ENGLISH TECHNICAL ASSISTANCE SERVICE...