DOC NO. 81028
8 OF 11
Rev D 08/17/06 NJL
3.
Install the temperature control sensor with bulb guard in the steam room approximately 5 feet above
the floor (see Figure 1).
NOTE: DO NOT mount sensor near steamhead!
4.
Bring the control sensor wire to the generator. With the top cover removed (see Figure 3),
connect the
control sensor wires, using wire nuts, to the two loose wires on the back of the control panel.
5.
Replace top access cover. Turn on both water and power to the generator.
6.
Test the touch pad to ensure it is properly wired. If any technical problems arise, call toll free
800-776-0711.
Failure to follow installation instructions specifically may cause the warranty to be void!
Figure 3