
Menu 08 – Stove Status
In menu 08, the display will show the status of several variables during the operation of the
stove. The table below shows variables in the display. The same displays are held by
pressing the individual buttons P1, P2, P5, P6 for a few seconds.
Menu 09 – Technical Settings
This item in the menu is accessible only to the technician who installed the heater.
Menu 10 – Pellet Type
Pressing P1 or P2 will modify the pellet loading percentage up to a maximum value of +9 and
down to a minimum value of -9. Each step increases or decreases it by around 3% of the total
period of the feed screw, with respect to the default period (pellet type = 0). The T-ON
AUGER time does not change.
WARNING
During periods of disuse, the stove must be unplugged. For greater safety, especially if there
are children around, we recommend removing the supply cable from the rear of the stove.
NOTICE
The stove will be subject to expansion and contraction during the start-up and cooling
phases, therefore light creaking noises may be heard. This is absolutely normal as the
structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the product is not immediately overheated and the
temperature is increased gradually, initially using low power. This will prevent damaging the
welds and the steel structure.
Avoid touching the stove during the initial start-up, as the paint in this stage hardens; by
touching the paint, the steel surface may be exposed.
After a long period of inactivity, remove any pellets left in the hopper (using a vacuum cleaner
with a long pipe), as they could have absorbed moisture, thereby altering their original
characteristics and no longer being suitable for combustion.
Содержание HYDRA PLUS
Страница 1: ...HYDRA PLUS Installation and User Manual 2021 R02 Hydra Plus_Micronova ...
Страница 8: ......
Страница 41: ...12 FOR INSTALLERS ONLY 12 1 Control board lay out ...