![Thermal AXAI-06M Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/thermal/axai-06m/axai-06m_installation-manual_1103121018.webp)
17
Installation procedure
Mounting the unit
When installing the unit, please refer to “Installation guidelines” to select an appropriate
location.
1. Check the strength and level of the installation ground so that the unit will not cause any
operating vibration or noise after installation.
2. Prepare 4 sets of M8 foundation bolts, nuts and washers each (filed supply).
3. Fix the unit securely by means of the foundation bolts in accordance with the foundation
drawing. It is best to screw in the foundation bolts until their length remains 20mm above
the foundation surface.
NB; Wall brackets are not supplied with the unit unless specified an installation guide
is supplied within the wall brackets packaging
Check before running
Check before initial startup
Turn off the power before connecting
After installation, before accessing circuit breaker, please check the contents:
1. Field Wiring
Make sure the wiring of instrument panel and the host, the wiring between the unit and the
tank is in accordance with instructions guide, schematics is followed European and national
laws.
2. Fuse or protective device
Содержание AXAI-06M
Страница 4: ...AXAI 12M AXAI15M 1 ...
Страница 5: ...4 The manual 1 ...
Страница 10: ...9 Cycle diagram AXAI 06M AXAI 09M AXAI 12M AXAI 15M OVERVIEW OF THE UNIT External AXAI 06M AXAI 09M ...
Страница 11: ...10 Internal AXAI 06M AXAI 09M ...
Страница 12: ...11 External AXAI 12M AXAI 15M Internal AXAI 12M AXAI 15M ...
Страница 13: ...12 Wiring Diagram Electrical Wiring Diagram for the 6 9KW ...