Air Filter:
A. Perform a visual inspection of air filter and
replace as necessary.
1. Remove upper front panel.
2. Remove red tube from nipple on filter assembly.
3. Remove wing nut.
4. Remove filter assembly from boiler. For the
EVS-2000S-3000: to facilitate assembly
removal, loosen the two upper screws on the
lower front panel and lean the lower front panel
forward. Remove the blower filter front plate, if
necessary.
5. Remove foam pre-filter and wash with soap and
water.
6. Replace primary filter as necessary.
Pilot Flame:
A. Perform a visual inspection of pilot burner
flame.
1. Refer to the flame safeguard instruction manual
and conduct a pilot turndown test.
2. Observe pilot operation and record pilot signal.
Flame should be steady medium hard blue
clearly visible through sight glass.
B. Pilot Cleaning and Maintenance
1. Shut off gas supply and disconnect electrical
service.
2. Disconnect scanner, ignition electrode, loosen
and remove pilot gas line and combustion air line
from fan.
3. Remove mounting fasteners and pull pilot
assembly from heat exchanger.
4. Examine pilot electrode and set gap to 1/8” if
needed. Clean as required.
5. Reassemble in reverse order using a new gasket
available from Thermal Solutions.
Burner Flame:
A. Perform a visual inspection of main burner flame.
1. Observe main flame and record flame signal.
Flame should be steady deep orange in color
with dark blue checkerboard pattern throughout.
2. Main burner requires no cleaning or annual
maintenance
Main Burner:
A. When properly maintained and operated the burner
does not require servicing.
CAUTION
Do not attempt to remove or service burner.
Damage to the burner may result. Consult boiler
manufacturer.
B. When the air filter is not properly maintained, the
burner is susceptible of clogging. Check manifold
pressure during the purge cycle to test for clogging.
1. Install a pressure fitting in the tapping on the gas
manifold valve inside the boiler.
2. Attach a pressure monitoring device to the
pressure fitting.
3. Check the pressure while the boiler is in the
purge sequence.
4. If the measured pressure is considerably higher
than expected, consult factory.
Check Combustion and Safety Controls:
A. Check flame failure detection system with system
operating.
1. Pilot
a. Refer to the flame safeguard instruction
manual.
b. Manually close pilot fuel supply and
verify lock out of primary control.
2. Main Flame
a. Refer to the flame safeguard instruction.
b. Close manual main fuel shut off valve
and verify lockout of primary control.
Heat Exchanger:
A. Remove lower front jacket panel and check for
any signs of corrosion or leaks.
B.
Remove pipe plugs in header and inspect inside
of copper tubes and header.
C.
Flush boiler and mechanically remove any
scale.
D. INSPECTION AND CLEANING PROCEDURES
Содержание EVS SERIES
Страница 13: ...13 Figure 3 Sidewall Positive Pressure Venting Optional Figure 2 Sidewall Positive Pressure Venting ...
Страница 14: ...14 Figure 4 Vertical Pressurized Venting ...
Страница 16: ...16 Figure 5 Typical Negative Pressure Conventional Venting ...
Страница 18: ...18 Figure 7 Vertical Air Intake Piping ...
Страница 27: ...27 Figure 9a 208 230 460V 1 3 ph 60 Hz Supply Power Wiring Schematic ...
Страница 28: ...28 Figure 9b 120V 1ph 60Hz Supply Power Wiring Schematic ...
Страница 29: ...29 Figure 9c Standard UL FM CSD 1 Wiring Diagram EVS 500 2000 ...
Страница 31: ...31 Figure 9e Standard UL FM CSD 1 EVS 2000S 3000 ...
Страница 35: ...35 Figure 11 Modular System Horizontal Air Intake Piping ...
Страница 36: ...36 Figure 12 Modular System Vertical Air Intake Piping ...
Страница 37: ...37 Figure 13 Modular System Typical One Pipe Water Piping ...
Страница 38: ...38 Figure 14 Modular System Typical Primary Secondary Water Piping ...
Страница 39: ...39 Figure 15 Modular System Typical Primary Secondary without System Pump ...
Страница 40: ...40 Figure 16 Modular System Typical Reverse Return Water Piping ...
Страница 41: ...41 Figure 17 Modular System Reverse Return with System Pump Only ...
Страница 42: ...42 Figure 18 Modular System Typical Primary Secondary with Reverse Return ...
Страница 58: ...58 Figure 19 Combustion Chamber Assembly ...
Страница 60: ...60 Figure 20 Burner Assembly FRONT VIEW TOP VIEW ...
Страница 62: ...62 Figure 21 UL FM CSD 1 Main Gas Train Assembly ...
Страница 65: ...65 Figure 22b DB B Gas Train 500 750 Figure 22c DB B Gas Train 1000 2000 ...
Страница 70: ...70 Figure 23 Jacket Panels ...
Страница 74: ...74 Figure 25 Pilot Assembly Bishop Design ...
Страница 88: ...88 NOTES ...
Страница 89: ...89 NOTES ...
Страница 90: ...90 NOTES ...
Страница 91: ...91 NOTES ...