8
II. Unpacking the Water Heater
E.
Tilt the water heater to one side and slide a small
roller under the raised base.
F.
Tilt the water heater to the other side and slide
another roller under the base.
Place a larger pipe roller on floor behind the skid.
G.
Roll the water heater forward or backward off the
skid and onto the pipe roller.
H.
Move water heater to its permanent location.
A
.
Move water heater to approximate installed
position.
B.
Remove all crate fasteners.
C.
Open outside container and remove all inside
protective spacers and bracing.
D.
Remove all appliance hold-down fasteners.
CAUTION
Do not drop water heater. Do not bump water
heater jacket against floor.
WARNING
Installation of this water heater should be under-
taken only by trained and skilled personnel from
a qualified service agency.
E
C
I
T
O
N
,
r
e
l
i
o
b
e
h
t
f
o
t
n
e
t
n
o
c
r
e
t
a
w
w
o
l
e
h
t
o
t
e
u
D
o
t
d
r
a
g
e
r
h
t
i
w
r
e
l
i
o
b
e
h
t
f
o
g
n
i
z
i
s
t
c
e
r
r
o
c
n
i
n
i
t
l
u
s
e
r
l
l
i
w
d
a
o
l
m
e
t
s
y
s
g
n
i
t
a
e
h
e
h
t
d
e
t
a
r
e
l
e
c
c
a
d
n
a
g
n
i
l
c
y
c
r
e
l
i
o
b
e
v
i
s
s
e
c
x
e
s
n
o
i
t
u
l
o
S
l
a
m
r
e
h
T
.
e
r
u
l
i
a
f
t
n
e
n
o
p
m
o
c
y
b
d
e
s
u
a
c
s
e
r
u
l
i
a
f
t
n
a
r
r
a
w
T
O
N
S
E
O
D
O
D
.
s
n
o
i
t
a
c
i
l
p
p
a
r
e
l
i
o
b
d
e
z
i
s
y
l
t
c
e
r
r
o
c
n
i
.
m
e
t
s
y
s
e
h
t
o
t
r
e
l
i
o
b
e
h
t
e
z
i
s
r
e
v
o
T
O
N
e
h
t
e
c
u
d
e
r
y
l
t
a
e
r
g
s
r
e
l
i
o
b
r
a
l
u
d
o
M
.
g
n
i
z
i
s
r
e
v
o
r
e
l
i
o
b
f
o
d
o
o
h
i
l
e
k
i
l
NOTICE
Water heater crate is equipped with a tip & tell
label. If label indicates water heater has been
tipped over during shipping, remove crate and
inspect before trucker leaves.
Содержание EVA-1000
Страница 13: ...13 Figure 3 Sidewall Pressurized Venting Optional Figure 2 Sidewall Pressurized Venting...
Страница 14: ...14 Figure 4 Vertical Pressurized Venting...
Страница 16: ...16 Figure 7 Vertical Air Intake Piping...
Страница 26: ...26 Figure 9a Standard UL FM CSD 1 Wiring Diagram On Off...
Страница 27: ...27 Figure 9b Standard UL FM CSD 1 Wiring Diagram Modulation...
Страница 30: ...30 Figure 11 Modular System Horizontal Air Intake Piping...
Страница 31: ...31 Figure 12 Modular System Vertical Air Intake Piping...
Страница 46: ...46 This Page is Deliberately Left Blank...
Страница 47: ...47 Troubleshooting Guide...
Страница 48: ...48 Troubleshooting Guide...
Страница 51: ...51 Figure 19 Combustion Chamber Assembly...
Страница 53: ...53 Figure 20 Burner Assembly FRONT VIEW TOP VIEW...
Страница 55: ...55 Figure 21c UL FM CSD 1 Main Gas Train Assembly On Off Modulation...
Страница 57: ...57 Figure 22a DB B w POC Gas Train On Off 500 750 Figure 22b DB B w POC Gas Train On Off 1000 2000...
Страница 59: ...59 Figure 24b DB B w POC Gas Train Modulation 1000 2000 Figure 24a DB B w POC Gas Train Modulation 500 750...
Страница 61: ...61 Figure 25 Jacket Panels Indoor Units 4D 4J 4C 4B 4F 4I 4G 4E 4R 4K 4H 4J 4N 4M 4L 4Q 4A 4P 4P...
Страница 63: ...63 Figure 26a Control Panel Assembly On Off...
Страница 65: ...65 Figure 26b Control Panel Assembly Modulation...
Страница 67: ...67 Figure 27 Bishop Pilot Assembly...
Страница 71: ...71 NOTES...
Страница 72: ...72 NOTES...
Страница 73: ...73 NOTES...