4
I. Pre-Installation ................................. 6
II. Unpacking the Water Heater .......... 8
III. Installation........................................ 9
A. Vent Guidelines Due to Removal
of an Existing Water Heater.........9
B. Venting ........................................ 9
C. Combustion Air ......................... 16
D. Water Treatment ....................... 18
E. Water Piping and Trim .............. 19
F. Gas Piping ................................ 22
G. Electrical ................................... 26
Table of Contents
Minimum Clearance to Combustible Materials
Left Side
Right Side
Front
Rear
Top
Flue Connector
6"
6"
24"
6"
6"
18"
*Recommended Clearance for Service*
Left Side or Right Side
Front
Rear______ Top
500
24"
24"
24"
16"
750
24"
24"
24"
16"
1000
24"
24"
24"
16"
1500
24"
24"
24"
19"
2000
24"
24"
24"
31"
* When 3 or more units are mounted side-by-side, front service clearance increases by 12"
and the rear service clearance increases by 24".
NOTE: Verify clearance with local codes.
H. Modular Systems ...................... 29
I. Condensate Drains ................... 34
IV. System Start-up ............................. 36
V. Operation ....................................... 39
VI. Service/Maintenance ..................... 43
VII. Repair Parts .................................. 52
VII.
Appendix A. Temperature
Controller Operation for
Modulating Water Heaters ............. 69
NOTICE
Modular systems (two or more EVA Series water heaters) may be installed with zero (0) side clearances
between the water heaters.
Содержание EVA-1000
Страница 13: ...13 Figure 3 Sidewall Pressurized Venting Optional Figure 2 Sidewall Pressurized Venting...
Страница 14: ...14 Figure 4 Vertical Pressurized Venting...
Страница 16: ...16 Figure 7 Vertical Air Intake Piping...
Страница 26: ...26 Figure 9a Standard UL FM CSD 1 Wiring Diagram On Off...
Страница 27: ...27 Figure 9b Standard UL FM CSD 1 Wiring Diagram Modulation...
Страница 30: ...30 Figure 11 Modular System Horizontal Air Intake Piping...
Страница 31: ...31 Figure 12 Modular System Vertical Air Intake Piping...
Страница 46: ...46 This Page is Deliberately Left Blank...
Страница 47: ...47 Troubleshooting Guide...
Страница 48: ...48 Troubleshooting Guide...
Страница 51: ...51 Figure 19 Combustion Chamber Assembly...
Страница 53: ...53 Figure 20 Burner Assembly FRONT VIEW TOP VIEW...
Страница 55: ...55 Figure 21c UL FM CSD 1 Main Gas Train Assembly On Off Modulation...
Страница 57: ...57 Figure 22a DB B w POC Gas Train On Off 500 750 Figure 22b DB B w POC Gas Train On Off 1000 2000...
Страница 59: ...59 Figure 24b DB B w POC Gas Train Modulation 1000 2000 Figure 24a DB B w POC Gas Train Modulation 500 750...
Страница 61: ...61 Figure 25 Jacket Panels Indoor Units 4D 4J 4C 4B 4F 4I 4G 4E 4R 4K 4H 4J 4N 4M 4L 4Q 4A 4P 4P...
Страница 63: ...63 Figure 26a Control Panel Assembly On Off...
Страница 65: ...65 Figure 26b Control Panel Assembly Modulation...
Страница 67: ...67 Figure 27 Bishop Pilot Assembly...
Страница 71: ...71 NOTES...
Страница 72: ...72 NOTES...
Страница 73: ...73 NOTES...