Adequate combustion and ventilation air must be
provided to assure proper combustion.
I. Pre-Installation
A
.
Installation must conform to the requirements of
the authority having jurisdiction. In the absence
of such requirements, installation must conform
to the National Fuel Gas Code, NFPA 54/ANSI
Z223.1, and/or CAN/CGA B149.1 Natural Gas
and Propane Installation Code. Where required
by the authority having jurisdiction, the installation
must conform to the Standard for Controls and
Safety Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1.
B.
The water heater is not design certified for
installation on combustible flooring. The water
heater must not be installed on carpeting.
C.
Provide clearance between water heater jacket
and combustible material in accordance with local
fire ordinance. Refer to page 4 of this manual
for minimum listed clearance from combustible
material.
D.
Install on level floor. For basement installation
provide concrete base if floor is not perfectly level
or if water may be encountered on floor around
water heater. Floor must be able to support
weight of water heater, water and all additional
system components.
E.
Protect gas ignition system components from
water (dripping, spraying, rain, etc.) during
water heater operation and service (circulator
replacement, condensate trap service, control
replacement, etc.).
F.
Provide combustion and ventilation air in
accordance with applicable provisions of local
building codes or: USA - National Fuel Gas
Code, NFPA 54/ANSI Z223.1, Section 5.3, Air for
Combustion and Ventilation; Canada - Natural Gas
Installation Code, CAN/CGA - B149.1, or Propane
Installation Code, CAN/CGA - B.149.2, Part 5,
Venting Systems and Air Supply for Appliances.
G.
Locate the water heater in an area where leakage
of the appliance or connections will not result in
damage to the area adjacent to the appliance or to
lower floors of the structure. When such location
cannot be avoided it is recommended that a
suitable drain pan, adequately drained, be
installed under the appliance; however, the
pan must not restrict combustion air flow.
H.
Provide adequate combustion and ventilation air
required for operation of the water heater. Refer
to the venting and combustion air sections of this
manual for specific instructions.
I.
Provide adequate clearance for servicing and
proper operation.
J.
For other than direct vent applications, the
appliance must be located as close as possible to
a chimney or gas vent.
The following guideline is based on the
National Fuel
Gas Code
, NFPA 54/ANSI Z223.1.
1. Determine volume of space (boiler room).
Rooms communicating directly with space
(through openings not furnished with doors) are
considered part of space.
Volume [ft³] = Length [ft] x Width [ft] x Height [ft]
2. Determine Total Input of all appliances in
space. Round result to nearest 1,000 Btu per
hour (Btuh).
3. Determine type of space. Divide Volume by
Total Input.
a. If result is greater than or equal to 50 ft³
per 1,000 Btuh, space is considered an
unconfined space
.
b. If result is less than 50 ft³ per 1,000 Btuh,
space is considered a
confined space
.
4. Determine building type. A building of
unusually tight construction
has the following
characteristics:
a. Walls and ceiling exposed to outside
atmosphere have a continuous water vapor
retarder with a rating of 1 perm or less with
openings gasketed and sealed, and;
b. Weather-stripping has been added on
openable windows and doors, and;
c. Caulking or sealants applied in joints around
window and door frames, between sole
plates and floors, between wall-ceiling
joints, between wall panels, at plumbing
and electrical penetrations, and at other
openings.
WARNING
Carefully read all instructions before installing
water heater. Failure to follow all instructions in
proper order can cause personal injury or death.
Содержание EVA-1000
Страница 13: ...13 Figure 3 Sidewall Pressurized Venting Optional Figure 2 Sidewall Pressurized Venting...
Страница 14: ...14 Figure 4 Vertical Pressurized Venting...
Страница 16: ...16 Figure 7 Vertical Air Intake Piping...
Страница 26: ...26 Figure 9a Standard UL FM CSD 1 Wiring Diagram On Off...
Страница 27: ...27 Figure 9b Standard UL FM CSD 1 Wiring Diagram Modulation...
Страница 30: ...30 Figure 11 Modular System Horizontal Air Intake Piping...
Страница 31: ...31 Figure 12 Modular System Vertical Air Intake Piping...
Страница 46: ...46 This Page is Deliberately Left Blank...
Страница 47: ...47 Troubleshooting Guide...
Страница 48: ...48 Troubleshooting Guide...
Страница 51: ...51 Figure 19 Combustion Chamber Assembly...
Страница 53: ...53 Figure 20 Burner Assembly FRONT VIEW TOP VIEW...
Страница 55: ...55 Figure 21c UL FM CSD 1 Main Gas Train Assembly On Off Modulation...
Страница 57: ...57 Figure 22a DB B w POC Gas Train On Off 500 750 Figure 22b DB B w POC Gas Train On Off 1000 2000...
Страница 59: ...59 Figure 24b DB B w POC Gas Train Modulation 1000 2000 Figure 24a DB B w POC Gas Train Modulation 500 750...
Страница 61: ...61 Figure 25 Jacket Panels Indoor Units 4D 4J 4C 4B 4F 4I 4G 4E 4R 4K 4H 4J 4N 4M 4L 4Q 4A 4P 4P...
Страница 63: ...63 Figure 26a Control Panel Assembly On Off...
Страница 65: ...65 Figure 26b Control Panel Assembly Modulation...
Страница 67: ...67 Figure 27 Bishop Pilot Assembly...
Страница 71: ...71 NOTES...
Страница 72: ...72 NOTES...
Страница 73: ...73 NOTES...