Section 1 – Hookup and Installation

 

1. The TH-750 should be located in an area so that it will be easily accessible for any

 

inspection 

and repairs. Secure to the floor using the four mounting holes in the base floor

 

stand.

2. Pipe clean water o

r

 fluid to be heated to the inlet on the lower side making provision for the

loop recirculation. Install a check valve and suitable “Y” strainer on the inlet.

3. Pipe the heat

er outlet

 from the top of the TH-750 to the users. A recirculation loop for the

 

h

ot circuit

 is recommended.

4. Service (isolation) valves should be located at all inlets and outlets.

5. Always open the cold side first and check for any leaks.

6. Pipe steam (125 psig Max) to the control inlet valve. If a “Y” strainer and drip steam trap were

not supplied with the TH-750 heater, they should be installed with the isolation valve.

7. If a “Y” strainer and drip trap are not installed, dirt and condensate will build up on zero or low

load conditions. 

Failure to install a “Y” strainer and drip trap on the steam supply line

voids the warranty.

8. Be sure the steam supply is sized correctly – consult Thermaflo Engineering if you are unsure

of the size.

9.

Always open the cold (WATER) side first before opening the hot (STEAM) side and always

introduce steam to the unit slowly.

10.  For  gravity  return  systems,  the    TH-750  will  be    supplied  with    a    factory  sized  Float  &

 

Thermostatic steam trap. 

Never substitute with another manufacturer’s steam trap or a

 

different  trap  other  than  that  supplied  with  the  TH-750V  unit  as  this  could  effect

 

operation and will  void  the  warranty

. If  the  steam  trap  cannot  be  located  at  the  time of

 

installation, contact your local Thermaflo Engineering representative.

11. 

For TH-750 units installed where the condensate drains into a gravity return system,

 

the condensate piping must not be elevated or lifted as this will cause water hammer,

 

erratic control, flooding of the tube steam space, premature tube failure and will void

 

the warranty.

12. For pressurized condensate return systems or where a  lift  is  required, the TH-750 should

 

be supplied and fitted with a Thermaflo Engineering pump trap

 

o

n

 pressure powered

pump in place of the F & T trap.

13. Pipe the high temperature dump valve shell drain valve P&T Valve to suitable drain.

This valve will discharge a  considerable amount of water when it opens. Never allow this valve to

be piped to drain that will not carry full flow discharge. Installer is responsible for selecting

adequate drain size. See drawing for details.

14. Always  leave  the  vacuum breaker, located  below the  inlet  steam  pressure  gauge,  open  to

atmosphere.

Содержание TH-750 Series

Страница 1: ...Engineering r TH 750 SERIES STEAM FIRED WATER HEATER OPERATION MAINTENANCE MANUAL READ THIS MANUAL COMPLETELY BEFORE ATTEMPTING START UP P O Box 473639 Charlotte NC 28247 12249 Nations Ford Road Pinev...

Страница 2: ...nic Steam Control Valve Powder Coated Base Support Stands Electronic Version Shown MADE IN USA PRODUCTS Manufacturing Facilities 12249 Nations Ford Road Pineville NC 28134 www thermafloengineering com...

Страница 3: ...st before opening the hot STEAM side and always introduce steam to the unit slowly 10 For gravity return systems the TH 750 will be supplied with a factory sized Float Thermostatic steam trap Never su...

Страница 4: ...lectric or self acting actuation of the steam control valve require no outside air source 19 Prior to startup all head flange bolts should be retightened as these may have loosened during shipping or...

Страница 5: ...hell Never use the Pressure Temperature relief valve to remove air 7 The digital controller will sequence for a few minutes following initial power up and then return to its operation mode The control...

Страница 6: ...oller will begin to increase as the steam is being introduced to the heating coil 17 After about 10 minutes of warm up slowly open fully the inlet steam isolation valve and allow the TH 750 to come up...

Страница 7: ...ll utilize the Thermaflo Engineering type 25 series valve A manual corresponding with the valve type supplied is included in the documentation package that accompanies the TH 750 heater 24 The control...

Страница 8: ...SCHEMATICS ON PAGES 19 26 OF THIS MANUAL Process Value Set Point Value Constant light equals process is running a flashing light equals a pause in the process Arrow keys adjust settings such as set po...

Страница 9: ...water outlet line b Cold water inlet line c Condensate return line or boiler high temperature water return line 5 After the system has cooled drain the unit by opening the tank drain valve and holding...

Страница 10: ...p should be verified and isolation valves have been fitted on each side of the pump for this service If the pump is not running make sure the pump ON OFF switch black in color and located on the right...

Страница 11: ...ing any maintenance procedures 16 Follow Steps 1 through 7 of the shutdown procedures page 8 to take the unit offline before attempting to remove and inspect the heat exchanger coil 17 Assure that the...

Страница 12: ...ighten the nuts c Number all bolts so that torque requirements can be followed d Apply torque in three steps of 60 80 then 100 of required final torque loading all bolts at each step before proceeding...

Страница 13: ...gauge 28 If the unit is equipped with a circulating pump the pump relay must be interlocked with the temperature control valve so that the energy source will shut off if the pump is not operational Fa...

Страница 14: ...emove the top thermometer from the shell The connection will be a and is located at the very top of the shell 4 Than using a small flexible funnel completely fill the shell with DD518 biodegradable de...

Страница 15: ...13...

Страница 16: ...REV 5 SEQUENCIAL ORDER 1 2 ROTATIONAL ORDER 1 3 4 5 5 6 3 7 8 7 2 6 4 8 1 2 1 3 4 5 5 6 9 7 8 3 9 10 7 11 12 11 2 6 10 4 8 12 APPENDIX A Bolt Torque Procedure 8 BOLTS SEQUENCIAL ORDER ROTATIONAL ORDE...

Страница 17: ...3 13 14 15 15 16 7 17 18 19 19 20 11 2 14 6 18 10 4 16 8 20 12 APPENDIX A Bolt Torque Procedure 16 BOLTS 20 BOLTS SEQUENCIAL ORDER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 SEQUENCIAL ORDER ROTATIONAL OR...

Страница 18: ...domestic hot water supply it is highly recommended to install a master blend valve to prevent any chance of scalding Hookup shown with Float Thermostatic steam trap piped to gravity atmospheric conden...

Страница 19: ...ty atmospheric condensate return line For pressurized condensate return systems or where a lift is required the TH 750 must be fitted with a Thermaflo Engineering pump trap in place of the F T trap 3...

Страница 20: ...ravity atmospheric condensate return line For pressurized condensate return systems or where a lift is required the TH 750 must be fitted with a Thermaflo Engineering pump trap in place of the F T tra...

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Отзывы: