Installation Instructions
English | 20 |
3. Plug the wire connector assembly supplied with the
blower housing to the mating cable connector from the
range hood.
A.
A
B
C
Hood assembly connector
B. Plastic cable holders
C. Cable holder screws
Mounting the lower duct covers
1. Place the lower duct covers over the hood assembly.
2. Assembly the two pieces over the upper duct cover
assembly.
•
Slide the edge of the duct cover under the clip
located in the opposite duct cover.
•
Push them until you hear a click. The bulges on the
edge of the duct covers has to enter in the clip
slots.
3. Slide the lower duct cover assembly down to the base of
the hood.
Recirculating Kit (optional)
When used in recirculation mode, To Reduce the Risk of
Fire and Shock use only conversion kit Model RECHMIB.
If it is not possible to vent cooking fumes and vapors to
the outside, the hood can be used in the non-vented
(recirculating) version, using the recirculating kit .
Fumes and vapors are recycled through the grid.
See optional accessories section.
Installing the air delector:
1.
Assemble the air delector with the upper horizontal
support with 2 assembly screws pèr side.
2. Measure length of 8” (20.3 cm) vent needed to connect
the transition to the delector.
NOTE: Flexible Vent may needed.
NOTE: Vent should it up inside delector 1” (2.5 cm)
minimum.
3.
Install vent between the transition and the delector.
NOTE: To make vent installation easier, temporarily
remove the delector from the chimney support bracket
and replace after vent section is in place.
4. Seal all connections with vent clamps.