Installation Instructions
English | 14 |
Mounting the hood structure
1. Place the template in the ceiling considering the
instructions for ceiling support structures.
NOTE: Always consider the front of hood legend when
playing the template on the ceiling.
It will deine the control’s location.
2. Mark with a pencil the hole locations for screws and
duct in the ceiling.
3. Install the upper duct cover brackets on one of the
horizontal supports.
4. Fix the the upper horizontal support (the one with the
upper duct cover brackets) with 4 - 5 x 45 mm screws.
5. Install the lower vertical supports to the lower horizontal
support with 8 - 4.2 x 8 mm screws.
B
A
A. Lower horizontal support
B. 8 - 4.2 x 8 mm screws
6. Install the 4 upper vertical supports with 16 - 4.2 x 8 mm
screws.
B
A
A. 4- Upper vertical supports
B. 16 - 4.2 x 8 mm screws