background image

3

Ceiling installation

A ceiling installation unit 73 A is available for simplified 

ceiling installation of the presence detector (see accessories). 

This also ensures cord grip and contact protection. The instal-

lation diameter is 72 mm (drill diameter 73 mm).

Surface-mount installation

A back box 110A is available for surface mount installation 

(see accessories).

7.  Switching

The presence detectors can be combined as master and slave: 

master in individual switching, master in parallel switching, 

master-slave parallel switching. 

Several push buttons can connected to one control input. 

Illuminated push buttons can only be used with neutral con-

ductor connection.

Individual switching

In individual switching, the presence detector as master 

detects presence and brightness and controls lighting.

L’

Master/slave parallel switching

If the detection area covered by one presence detector is 

insufficient (larger rooms), then up to 10 detectors can be 

operated in parallel by connecting P terminals. In the process, 

presence detection is performed by all detectors together. The 

master measures the brightness, operates the push buttons 

and controls the lighting. All other detectors are used as 

slaves. They only provide presence information.

Master

Slave

L’

 

Light measurement only with the master

 

Parameters are only set on the master

 

Switch up to 10 detectors in parallel

 

Use the phase with the same phase for all detectors.

 

Master: theRonda P360 -100 M

Slave: theRonda P360 Slave

Master/master parallel switching (for several 

lighting groups)

Several masters can be used in parallel switching setup. Each 

master controls its lighting group according to its own bright-

ness measurements. Delay times and brightness switching 

values are set individually on each master. Presence continues 

to be detected by all the detectors.

Содержание theRonda P360-100 M UP WH

Страница 1: ...lectrician in accordance with the technical regulations applying to electricity Comply with the country specific safety regulations for work on electrical systems Ensure absence of voltage in the cabl...

Страница 2: ...reduced as temperatures increase Seated persons The details relate to smallest movements at table height approx 0 80 m Moving persons At installation heights of between 5 and 10 m the extent and dist...

Страница 3: ...ave parallel switching If the detection area covered by one presence detector is insufficient larger rooms then up to 10 detectors can be operated in parallel by connecting P terminals In the process...

Страница 4: ...min Classroom approx 10 min Work areas office meeting room approx 10 min Pulse Control staircase light time switch 0 5 s on 10 s off Parameters and control commands via remote control The following pa...

Страница 5: ...theSenda P man Button Control input S Control input S for manual switch on off of channel A light automatically detects push buttons or switches Several push buttons can be connected to control input...

Страница 6: ...AC 10 15 Frequency 50 60 Hz Upstream protection device 13 A Power consumption approx 0 1 W Type of installation Ceiling installation Flush surface mounted or ceiling installation Installation height...

Страница 7: ...test mode or LED display movement is activated The LED displays detection of movement Guarantee Theben HTS presence detectors are manufactured with the utmost care and using state of the art technolog...

Страница 8: ...act Theben HTS AG Im Langhag 7b 8307 Effretikon SWITZERLAND Phone 41 52 355 17 00 Fax 41 52 355 17 01 Hotline Phone 41 52 355 17 27 hotline theben hts ch www theben hts ch All countries except Switzer...

Отзывы: