
78
Promark2 User’s Guide
The
Survey Menu
is accessible any time during the data collection process by
pressing the Menu button. This is the same
Survey Menu
discussed earlier. All
setup functions in the
Survey Menu
can be utilized at any time during the
observation. In other words, steps 3-8 above can be performed after data collection
begins, if desired. This allows data collection to begin prior to the setup process,
reducing time on point.
Note that if the receiver ID is changed while collecting data, the name of the current
active data file will include the receiver ID that was set when data collection was
started.
16. Turn off receiver when finished.
When you are satisfied that enough data has been collected by all the GPS receivers
currently collecting data in this observation session, simply turn off the receiver to
end the session.
Note: To avoid possible damage to the external antenna connector, unplug the external
antenna cable from the receiver prior to removing the receiver from the cradle. Also note
that if the receiver ID is changed while collecting data, the name of the current active data
file will include the receiver ID set when data collection started.
Multiple base stations can be utilized. Follow the steps presented above for each base station
used in your survey. After data collection is complete, take all GPS receivers used in the
survey to the office and download the data to an office computer as described elsewhere in this
manual. The data is now ready for processing using Ashtech Solutions.
Содержание CGRS
Страница 1: ...ProMark2 TM System User Guide www thalesnavigation com THALES NAVIGATION ...
Страница 14: ...xiv ProMark2 User s Guide ...
Страница 36: ...22 Promark2 User s Guide ...
Страница 156: ...142 ProMark2 User s Guide ...
Страница 159: ......