
143
A
active survey data file
almanac
.............................................37
antenna height
Ashtech
..............................................38
Ashtech Solutions
B
battery status
....................................26
begin data collection
.............................................. 94
begin data storage
boundary survey
...............................31
C
closed-loop traverse
collected data
....................................31
control point
.......................................35
control tag
........................................117
correction messages
current
constellation
...............................38
date
.............................................29
location
.......................................29
time
..............................................29
D
dealer nearest you
delete old files
delta positions
...................................35
direct link
............................................34
DOP
....................................................38
download
...................................... 7
E
EGNOS
..............................................15
...................................................21
ensure quality
....................................37
existing control point
F
file downloaded
...............................123
file not downloaded
first position fix
..................................29
G
GPS vector
........................................36
H
healthy satellites
HI
........................................................44
HI recording errors
........................... 44
HI tape
............................................... 44
horizontal control points
I
instrument height
............................. 44
internal memory
.............................1
intervisible points
K
known point initialization
L
large surveys
.................................... 40
line-of-sight
.................................34
link
...................................................... 35
losing data
......................................... 28
low-temperature operation
M
MAP330
............................................... 7
maps
.................................................... 6
MapSend Streets CD
memory
free
............................... 54
remaining
................................. 139
running out of
............................ 28
status
....................................54
Mission Planning
.............................. 38
mission planning
multipath
............................................ 15
N
naming file
narrative description
navigating to job site
navigation functions
no last position
................................. 29
O
observation
plan
............................................. 37
quality
...................................55
timer
times
.....................................37
observation time
obstruction considerations
obstructions
P
PDOP
pivot point
.......................................... 36
INDEX
Содержание CGRS
Страница 1: ...ProMark2 TM System User Guide www thalesnavigation com THALES NAVIGATION ...
Страница 14: ...xiv ProMark2 User s Guide ...
Страница 36: ...22 Promark2 User s Guide ...
Страница 156: ...142 ProMark2 User s Guide ...
Страница 159: ......