![Texmo Industries Taro HCS SJ Series Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/texmo-industries/taro-hcs-sj-series/taro-hcs-sj-series_instructions-and-operating-manual_1097614025.webp)
Use prescribed pipe sizes as mentioned on the product nameplate
Ensure the Jet Unit with Foot valve and Strainer is fixed to the end of suction and return pipes
located inside the bore well (HCSJ, TSJ, TDSJ Series). For the HCS SJ Series ensure the supplied
strainer is fitted at the bottom of the suction pipe located in the well. Refer Fig. 8, shown above,
for recommendations
When the pump is started for the first time, it needs to be primed.
Priming
In the HCS 80 / 11 and TDSJ Series, air cock is not provided. The volute casing internal design
permits air to rise towards the pressure valve during the priming process when pouring water
through the removed filling plug on the pressure valve as shown in Fig. 7 (a) and (b). When the
pump is primed, further water cannot be added. Stop pouring water and refit the filling plug
In the HCS SJ Series, open the ball valve as shown in Fig. 7 (c), and prime the pump. Shut the valve
after priming
In the HCS 40/70/90 and TSJ Series, remove the filling plug on the pressure valve and pouring
water into it as shown in Fig. 7 (d) and (e), keeping the air cock open to release air. When the
pump is primed, water continuously flows through the air cock. The pump is now primed. Stop
pouring water, close the air cock and refit the filling plug
In case the water level, during priming, in the pressure valve continuously falls, this indicates a
leak and a mechanic need to be consulted
The easiest method of setting the control valve, shown in Fig. 9(a) and (b), for optimum discharge is the visual
method. In this method, the pumpset is run and adjusting the Round Head Screw (15) and measuring the discharge.
By trial and error, adjust the Round Head Screw (15) till the flow of water in the discharge pipe is a maximum. Now
lock the Hex. Nut (2) to prevent the Round Head Screw (15) from loosening. To access the Round Head Screw (15), the
pressure valve Cap Nut (1) needs to be removed and then refitted after adjustment to prevent tampering.
Setting the pressure control valve for maximum discharge
OMJP001A
25
2020.01
Содержание Taro HCS SJ Series
Страница 1: ...Single Phase Jet Monoblocks Instruction Operating Manual OMJP001A 2020 01 ...
Страница 2: ...OMJP001A 2 2020 01 ...
Страница 24: ...BORE WELL JET UNIT FOOT VALVE DELIVERY PIPE JAR PRESSURE VALVE FILLING PLUG 8 e OMJP001A 24 2020 01 ...
Страница 33: ...OMJP001A 33 2020 01 ...
Страница 40: ...OMJP001A 40 2020 01 ...