6.3
Linking LUNs to/from Fibre Channel Controllers
To make partitioned LUNs accessible to connected servers, the
administrator must link the LUNs to the RamSan’s Fibre Channel
controllers.
6.3.1
Via Web Interface
To change the links between LUNs and the Fibre Channel
controllers via the Web Management Interface:
•
Click on the “Management Control Processor” graphic.
•
Click on the “LUN Config” tab.
•
Select the LUN to edit by clicking on the LUN graphic.
•
Click the “Modify LUN” button.
•
Select the links for the LUN by clicking the “Channel links”
checkboxes.
•
Click the “OK” button.
6.3.2
Via Text Management
Linking Fibre Channel Ports
•
From the Telnet Main Menu, select “LUN Setup”
•
Select “Link/unlink fibre channel controller(s) to/from
LUN(s)”
Figure 6-5: Link LUNs Screen
The Link LUNs screen displays the currently selected port above
the menu. Figure 6-5: Link LUNs Screen displays the selected
controller as 1-A, which is Port A.
•
To change the port, select “Select different channel”. This
displays a list of channels. Select one and press [ENTER].
In addition, the “Link/Unlink LUN(s)” screen indicates the number
of LUNs currently linked to the selected controller.
RamSan-120
User’s Manual
- 61 -