Hardware Connection
4-3
EVM Hardware and Software Setup
-
2-Cell LION Pack:
J
Connect the PACK+ terminal to the Cell2P terminal on the
bq2060AEVM-00X module.
J
Connect the BAT− terminal to the negative side of the bottom (first)
cell.
J
Connect the Cell2P terminal to the positive side of the top (second)
cell.
J
Connect the Cell1 terminal to the positive side of the first cell.
-
No Individual Cell Voltage Monitoring/NiMH:
J
Connect the PACK+ terminal to the Cell4P terminal on the
bq2060AEVM-00X module.
J
Connect the BAT− terminal to the negative side of the bottom (first)
cell.
J
Connect the Cell4P terminal to the positive side of the top cell.
Figure 4−1. bq2060A Circuit Module Connection to LION Cells and System Load/Charger
Optional
to SMBD/HDQ1
to SMBC/HDQ2
to VSS
EV2200
Bottom Cell
E2 VCC
VSS
SDA
SCL
Load/
Charger
Top Cell
Содержание bq2060AEVM-001
Страница 6: ...vi ...
Страница 14: ...2 4 ...
Страница 33: ...Schematic 5 13 Operation 5 7 Schematic The schematic diagram is appended to the PDF document ...
Страница 34: ......