
ACKF01_GB_00
TEXA S.p.A. 101/122
6.8
After-flushing recommendations
After having performed a system flushing we are recommending the following steps:
¾
Replace all O-rings of the system
¾
Replace the receiver drier or accumulator
¾
Drain and replace the compressor oil
¾
Reassemble the complete A/C system
¾
Pressurize the system with nitrogen and check for leakages
¾
Bring the system to deep vacuum to remove all moisture
¾
Inject UV additive in prevention for detecting leakage
¾
Recharge lubricant and refrigerant within manufacturer specifications
¾
Verify proper functioning of the system. (Noise, pressure, performances, leak check…)
Содержание ACKF01
Страница 1: ...ITALIANO ENGLISH FRANCAIS DEUTSCH ESPANOL 3 63 123 183 243...
Страница 2: ......