6. Preparations for commissioning
6.1. Installation location/ambient conditions
Caution
The operation of the mortar mixer is only permissible in
dry spaces!
The following limit values apply:
Ambient temperature
DIN EN 60204-1, 4.4.2
+5
C up to +40
C
Humidity
DIN EN 60204-1, 4.4.3
30% up to 95%
Note
Place the mortar mixer on a stable, level surface.
6.2. Electrical connection
A protective connection socket
110-240 volts 1Ph+1N+1PE, 50-60 Hz
must be used for
the mains connection of the mortar mixer.
The fuse should be fused with a maximum of 16 A. A residual current circuit breaker is
recommended.
Insert the Schuko plug, the mains cable of the mortar mixer, into the mains connection
socket.
Caution
Safety advice!
Work on electrical equipment may only be carried out by qualified
personnel!
Содержание 1.0206.01
Страница 47: ...Laboratory mortar mixer 1 0206 01 47 21 I O board...
Страница 48: ...Laboratory mortar mixer 1 0206 01 48 22 Circuit diagram...
Страница 50: ...Laboratory mortar mixer 1 0206 01 50 23 2 Mixing program 2 according to EN 480 T1...
Страница 51: ...Laboratory mortar mixer 1 0206 01 51 23 3 Mixing program 3 according to EN 196 T3...
Страница 52: ...Laboratory mortar mixer 1 0206 01 52 23 4 Mixing program 4 according to EN 196 T9...
Страница 54: ...Laboratory mortar mixer 1 0206 01 54 24 2 Mixing program 2 according to ASTM C451...
Страница 55: ...Laboratory mortar mixer 1 0206 01 55 24 3 Mixing program 3 according to ASTM C305 paste with start delay...
Страница 56: ...Laboratory mortar mixer 1 0206 01 56 25 4 Mixing program 4 according to ASTM C305 paste without start delay...