Table of Contents
Chapter 1 – Safety Instructions ________________________________________________ 1-1
Introduction ____________________________________________________________________ 1-1
Installation Safety Notices _________________________________________________________ 1-1
Operation Safety Notices __________________________________________________________ 1-2
Chapter 2 – Installation ______________________________________________________ 2-1
Uncrating _______________________________________________________________________ 2-1
Preparation For Use ______________________________________________________________ 2-1
Installation Location _____________________________________________________________ 2-2
Condensate Drain ________________________________________________________________ 2-2
Chapter 3 – Operation _______________________________________________________ 3-1
Introduction ____________________________________________________________________ 3-1
Summary of Chamber Operation ___________________________________________________ 3-1
Front Panel Switches and Lights ____________________________________________________ 3-2
Power Switch _________________________________________________________________________ 3-2
Conditioning Switch – ON Mode __________________________________________________________ 3-2
Conditioning Switch – Event 1 Mode _______________________________________________________ 3-2
Light Switch __________________________________________________________________________ 3-2
HEAT Light __________________________________________________________________________ 3-2
COOL Light __________________________________________________________________________ 3-2
Loading the Chamber ____________________________________________________________ 3-3
Port Plugs ____________________________________________________________________________ 3-3
Performance Considerations ______________________________________________________________ 3-4
Avoiding Moisture _____________________________________________________________________ 3-4
Internal Test Fixtures ___________________________________________________________________ 3-4
Chapter 4 – Limit Controller __________________________________________________ 4-1
Introduction ____________________________________________________________________ 4-1
Limit Controller Keys and Displays ________________________________________________________ 4-2
How to Set the High and Low Temperature Safety Limits _______________________________________ 4-2
Resetting an Out of Limit Condition ________________________________________________________ 4-2
Silencing the Audible Alarm ______________________________________________________________ 4-2
Protecting an Energized Test Sample _______________________________________________________ 4-3
Chapter 5 – Purge ___________________________________________________________ 5-1
Introduction ____________________________________________________________________ 5-1
GN2 (Gaseous Nitrogen) Installation (Option TE-1239) ________________________________________ 5-1
Dry Air Installation (Option TE-0017) ______________________________________________________ 5-1
Purge Operation _______________________________________________________________________ 5-2
Adjusting the Purge Flow ________________________________________________________________ 5-2
Relief Vent ___________________________________________________________________________ 5-2
Chapter 6 – Frequently Asked Questions ________________________________________ 6-1
Chapter 7 – Specifications ____________________________________________________ 7-1
Model 123C Chamber Specifications ________________________________________________ 7-1
Chapter 8 – Maintenance _____________________________________________________ 8-1
Preventive Maintenance Intervals __________________________________________________ 8-1
Daily or As Needed _____________________________________________________________________ 8-1
Every 3 Months ________________________________________________________________________ 8-1
Every 6 Months ________________________________________________________________________ 8-1
Every 12 Months _______________________________________________________________________ 8-1
Содержание 123C
Страница 2: ......
Страница 16: ......
Страница 22: ......
Страница 24: ......
Страница 40: ......
Страница 42: ......
Страница 43: ...Chapter 10 Drawings TestEquity 123C Temperature Chamber Page 10 1 Chapter 10 Drawings...
Страница 44: ......
Страница 45: ...Electrical Subpanel Component Location...