7
5.2 Sensor Set Up
1. Wind Vane
2. Wind Speed Sensor
3. UV sensor/ Light sensor
4. Thermo-Hygro sensor
5. Rain collector
6. Bubble level
7. Solar panel
8. U-Bolt
9. Battery compartment
10. Reset button
11. LED Indicator: light on for 4s if the unit powers up. Then the LED
will flash once every 16 seconds (the sensor transmission update
period).
5.2.1 Install U-bolts and mounting pole
Installation of the U-bolts, which are in turn used to mount the sensor
package on a pole, it requires installation of the included metal plate to
receive the U-bolt ends. The metal plate, visible in
Error! Reference
source not found.
1, has four holes through which the ends of the