![Terra CL 08-33 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/terra/cl-08-33/cl-08-33_technical-documentation-manual_1089560011.webp)
Page 11
Corner installation
A condensation run-off with siphon must
normally be fitted opposite the exhaust
opening for the heat pump.
The ideal position for the heat pump has proved to be in a
corner. Wall openings can be prepared by the customer in
advance. These openings must be insulated with closed
pore insulating material (minimum thickness 50mm).
Space required, accessibility:
To guarantee maintenance and operation of the heat
pump, the following minimum distances must be obser-
ved:
Front side (operation and maintenance side) = 800mm
Maintenance side = 500mm
Observing these distances will help ensure problem-free
system maintenance and operation.
min. 500mm
1
1
Heating connection /
Condensation run-off