EN
DEAR CUSTOMER
Thank you for selecting our product. The wiring, connection to the water supply and the first
commissioning must be carried out by a qualified expert with due attention to these instructions.
Information on fitting and operating must be carefully studied and the points raised must be observed
precisely. This will ensure that your appliance works reliable over the long term.
1. CONTENTS
The following accessories can be found in the box packaging:
1 user guide
1 warranty card
1 service notes
1 combined safety valve
Please check these when receiving the appliance.
General instructions
1
A qualified expert must carry out the commissioning and initial start of the
appliance in strict compliance with the effective provisions and regulations
pertaining to commissioning, furthermore, in compliance with any criteria
determined by local authorities and public healthcare organizations.
2
Inasmuch as the hot water storage tank being commissioned is not merely
replacing an existing appliance, but it forms a part of the renewal of an
existing hydraulic system or a new hydraulic system, the water heater
commissioning company – having completed the commissioning – shall be
required to issue a statement of compliance to the customer, in which it
verifies compliance with effective legal regulations and specifications. In
both cases the company carrying out the commissioning must complete
safety and operational checks on the entire system.