GB INSTRUCTION MANUAL
16
PRIOR TO OPERATION
The unit must rest for two hours before connecting to the main supply after
transports or when it has been tilted!
A.
Put the unit in proper location: complying with the requirements below can help
the unit achieve its best performance.
B.
Supply power should be in correspondence with the value on the nameplate.
Power outlet need be grounded.
C.
Take the main cord and plug it properly.
D.
Check and make sure that the space before air in/outlet is clear. Free wind flow
is the key to optimum performance and energy conservation.
E.
If continues dehumidifying function need to be used for a long period, drainage
pipe will be useful. Below are detailed operating procedures:
Plug drainage pipe with 9mm in diameter in the hose connector and tie it tense in
case of leaking as follows.
17
GB INSTRUCTION MANUAL
1. Front Panel
2. Luver
3. Control Panel Tank
4. Left Side Panel
5. Wheels
6. Right Side Panel
7. Filter
8. Water Outlet
9. Water Tank
10. Power Cord and Plug
11. Back Panel
12. Side handles
13. Air inlet
14. Air outlet
15. Hose for continuous dehumidifying included
15
12
14
13
PARTS LIST
Содержание 562100
Страница 32: ...62 63 ...