
2.
Use the pedestal mount bracket as a guide to mark
g, but will self-drill much faster
3. Fasten the DT cradle to
4. Attach the DT cable as desc
Install the pedestal mount bracket.
the holes. The 1/4" - 20 x 1.25" lag bolt is self-drillin
if a 1/8" pilot hole is drilled first.
the bracket with #10 screws.
ribed in the previous section.
8-3
Mobile Messaging System Installation Manual
June 15, 2001
UM20-100111B
Terion, Inc.
Содержание UM20-100111B
Страница 4: ...iv Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 12: ...2 2 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 44: ...8 4 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 52: ...11 4 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 60: ...13 6 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 62: ...A 2 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 72: ...C 2 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 74: ...D 2 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...
Страница 75: ......
Страница 76: ...D 4 Mobile Messaging System Installation Manual June 15 2001 UM20 100111B Terion Inc...