![Terex RT200-1 Скачать руководство пользователя страница 118](http://html1.mh-extra.com/html/terex/rt200-1/rt200-1_operators-manual_1088794118.webp)
Four wheel drive engagement is accomplished by a solenoid shifted coupling in the
transmissions. In the ranges F1 thru F3 and R2 and R3.
Observe the restrictions given in the following chart during on-the-road operation.
Maximum permissible running intervals are given in terms of miles and hours of
travel time. Stop the crane when either limit has been reached (whichever comes
first) and allow the crane to cool for the period indicated.
TIRE SIZE
PRESS. PSI
SPEED
RUNNING
INTERVAL
COOLING
PERIOD
21:00X25-28 PR 65
20 MPH AVG.
MAX.
2 HOURS
30 MIN.
4 HOURS
1 HOUR
26:50X25-26 PR 50
20 MPH AVG.
MAX.
2 HOURS
30 MIN.
4 HOURS
1 HOUR
Stop the engine.
Before stopping the engine, put the transmission in neutral, and reduce the engine speed.
Always idle the engine for at least 5 minutes before stopping it. This gives the engine a
chance to cool down and prevents overheating which can be caused by localized hot spots
in the engine. The idle speed must be high enough to charge the battery but not higher
than half speed. This cool down period is extremely critical on machines equipped with a
turbocharged engine.
After several minutes at idle, the engine may be shut off by pushing the engine stop button.
Turn the ignition switch to the OFF position after the engine has stopped.
VEHICLE TOWING If the vehicle is to be towed, it wil be necessary to run the engine at idle
speed to lubricate the transmission clutches. If the engine cannot be run, towing must be
limited to 3 mph and and one mile (max. total). If exceeded drive lines must be
disconnected, tow at 20 mph max.
117
P/N 12261-319 REVISED: August 2012
Содержание RT200-1
Страница 1: ...Courtesy of Crane Market...
Страница 5: ...Courtesy of Crane Market...
Страница 13: ...Courtesy of Crane Market...
Страница 47: ...Safety 46 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 79: ...Courtesy of Crane Market...
Страница 87: ...Courtesy of Crane Market...
Страница 124: ...Lubrication Chart Maintenance 123 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 150: ...149 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 152: ...151 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 174: ...173 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 195: ...Courtesy of Crane Market...
Страница 197: ...Courtesy of Crane Market...
Страница 199: ...1 Proximity Sensor Outrigger Position Service Parts 198 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 207: ...Torque Specs SAE Metric Appendix 206 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 208: ...207 P N 12261 319 REVISED August 2012 Courtesy of Crane Market...
Страница 211: ...Notes Courtesy of Crane Market...