Tech-Tip 93
16
Released: 6/19/2019
Tech Tips
The lower boom Qualification and Periodic
readings are shown below.
For a Chassis Insulating System (Lower Boom
Insert) Qualification test, the reading should be
no higher than 3000 µA for 3 minutes at 50 KV.
For a Chassis Insulating System (Lower Boom
Insert) Periodic/Maintenance test the reading
should be no higher than 3000 µA for 1 minute
at 35 KV.
µA=Microamp
Step 13