Operator's Manual
Seventh Edition • First Printing
Transport and Lifting Instructions
54 Z
®
-45J DC • Z
®
-45J Bi-Energy
Part No. 1307436GT
Securing to Truck or Trailer for
Transit
Always use the turntable rotation lock pin each time
the machine is transported.
The lock pin is located under the turntable on the
hydraulic tank side of the machine.
1
Turntable rotation lock pin
Turn the key switch to the off position and remove
the key before transporting.
Inspect the entire machine for loose or unsecured
items.
Securing the Chassis
Use chains of ample load capacity.
Use a minimum of 4 chains or straps.
Adjust the rigging to prevent damage to the chains.
Securing the Platform – Z-45/25J
Make sure the jib and platform are in the stowed
position.
Secure the platform with a nylon strap placed over
the platform mount near the platform rotator (see
below). Do not use excessive downward force
when securing the boom section.
Содержание Genie Z-45 BE
Страница 12: ...Operator s Manual Seventh Edition First Printing General Safety 10 Z 45J DC Z 45J Bi Energy Part No 1307436GT ...
Страница 13: ...Seventh Edition First Printing Operator s Manual General Safety Part No 1307436GT Z 45J DC Z 45J Bi Energy 11 ...
Страница 43: ...Seventh Edition First Printing Operator s Manual Inspections Part No 1307436GT Z 45J DC Z 45J Bi Energy 41 ...
Страница 45: ...Seventh Edition First Printing Operator s Manual Inspections Part No 1307436GT Z 45J DC Z 45J Bi Energy 43 ...
Страница 65: ......