October 2021
Service and Repair Manual
Primary Boom Components
Part No. 1268515GT
Z
®
-34/22 Bi-Energy
29
5 Attach a lifting strap from an suitable lifting
device to the primary boom lift cylinder.
6 Remove the rear turntable cover.
7 Place a 4x4 inch / 10 x 10 cm block between
the lower compression arms and the cross
member of the upper secondary boom.
Carefully lower the secondary boom onto the
block.
Crushing hazard. Keep hands
away from the block and all
moving parts when lowering the
secondary boom.
8 Remove the pin retaining fasteners from the
primary boom lift cylinder rod-end pivot pin.
Use a soft metal drift to remove the pin.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
9 Lower the rod end of the cylinder onto the
blocks that were placed on the upper
secondary boom.
10 Remove the pin retaining fasteners from the
upper compression arm pivot pin (same side
of machine as the primary boom lift cylinder
barrel-end pivot pin retaining fasteners).
11 Place a rod through the compression arm
pivot pin and twist to remove the pin.
12 Swing the compression arm up out of the way
and secure it from moving.
13 Tag, disconnect and plug the primary boom
lift cylinder hydraulic hoses. Cap the fittings
on the cylinder.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
14 Support the primary boom lift cylinder with
straps or ropes to restrict it from swinging
freely when the barrel-end pivot pin is
removed.
15 Remove the pin retaining fasteners from the
lift cylinder barrel-end pivot pin. Do not
remove the pivot pin.
16 Use the suitable lifting device to raise the
primary boom 1 inch / 2.5 cm. This will relieve
pressure on the barrel-end pivot pin.
17 Place a rod through the barrel-end pivot pin
and twist to remove the pin.
Crushing hazard. The primary
boom could become unbalanced
and fall when removed from the
machine if not properly attached
to the suitable lifting device.
18 Attach a lifting strap from an suitable lifting
device to the rod end of the primary boom lift
cylinder. Carefully loosen the straps and allow
the barrel end of the primary boom lift cylinder
to slowly swing down.
19 Carefully remove the cylinder from the
machine.
Содержание Genie Z-34/22
Страница 63: ...October 2021 Service and Repair Manual Manifolds Part No 1268515GT Z 34 22 Bi Energy 51 ...
Страница 85: ...October 2021 Service and Repair Manual 73 Electrical Schematic ANSI CSA from SN Z3414 9686 to Z34F 12065 ...
Страница 88: ...Service and Repair Manual October 2021 76 Electrical Schematic ANSI CSA from SN Z3414 9686 to Z34F 12065 ...
Страница 89: ...October 2021 Service and Repair Manual 77 Electrical Schematic ANSI CSA from SN Z34F 12066 ...
Страница 92: ...Service and Repair Manual October 2021 80 Electrical Schematic ANSI CSA from SN Z34F 12066 ...
Страница 93: ...October 2021 Service and Repair Manual 81 GBOX Switch Panel Wiring Diagram ANSI CSA from SN Z3414 9686 ...
Страница 96: ...Service and Repair Manual October 2021 84 GBOX Terminal Strip Wiring Diagram ANSI CSA from SN Z3414 9686 ...
Страница 97: ...October 2021 Service and Repair Manual 85 PBOX Wiring Diagram ANSI CSA from SN Z3414 9686 ...
Страница 99: ...October 2021 Service and Repair Manual 87 Electrical Schematic CE AS from SN Z3414 9686 to Z34F 12065 ...
Страница 102: ...Service and Repair Manual October 2021 90 Electrical Schematic CE AS from SN Z3414 9686 to Z34F 12065 ...
Страница 103: ...October 2021 Service and Repair Manual 91 Electrical Schematic CE AS from SN Z34F 12066 ...
Страница 106: ...Service and Repair Manual October 2021 94 Electrical Schematic CE AS from SN Z34F 12066 ...
Страница 107: ...October 2021 Service and Repair Manual 95 GBOX Switch Panel Wiring Diagram CE AS from SN Z3414 9686 ...
Страница 110: ...Service and Repair Manual October 2021 98 GBOX Terminal Strip Wiring Diagram CE AS from SN Z3414 9686 ...
Страница 111: ...October 2021 Service and Repair Manual 99 Platform Control Box Wiring Diagram CE AS from SN Z3414 9686 ...
Страница 114: ...Service and Repair Manual October 2021 102 Power Cable Wiring Diagram from SN Z3414 9686 ...
Страница 115: ...October 2021 Service and Repair Manual 103 Drive Contactor Panel Wiring Diagram ...
Страница 116: ...Service and Repair Manual October 2021 104 Z 34 22 Bi Energy Part No 1268515GT Drive Contactor Panel Wiring Diagram ...
Страница 117: ...October 2021 Service and Repair Manual Part No 1268515GT Z 34 22 Bi Energy 105 Manifold and Limit Switch Wiring Diagram ...
Страница 118: ...Service and Repair Manual October 2021 106 Manifold and Limit Switch Wiring Diagram ...
Страница 119: ...October 2021 Service and Repair Manual 107 LVI BCI Option Wiring Diagram ...
Страница 120: ...Service and Repair Manual October 2021 108 Z 34 22 Bi Energy Part No 1268515GT LVI BCI Option Wiring Diagram ...
Страница 121: ...October 2021 Service and Repair Manual Part No 1268515GT Z 34 22 Bi Energy 109 Charger Interlock Option ...
Страница 122: ...Service and Repair Manual October 2021 110 Charger Interlock Option ...
Страница 123: ...October 2021 Service and Repair Manual 111 Engine Wiring Diagram ...
Страница 124: ...Service and Repair Manual October 2021 112 Z 34 22 Bi Energy Part No 1268515GT Engine Wiring Diagram ...
Страница 126: ...Service and Repair Manual October 2021 114 Contact Alarm Option from SN Z34F 12066 ...
Страница 127: ...October 2021 Service and Repair Manual 115 Fuel Level Sensor Option from SN Z34F 12066 ...
Страница 129: ...October 2021 Service and Repair Manual 117 Hydraulic Schematic ...
Страница 131: ......