Service and Repair Manual
October 2021
Primary Boom Components
28
Z
®
-34/22 Bi-Energy
Part No. 1268515GT
7 Support and slide the extension tube out of
the outer primary boom tube. Place the
extension boom tube on blocks for support.
Crushing hazard. The boom
tubes could become
unbalanced and fall if not
properly supported by the
suitable lifting device.
Note: During removal, the suitable lifting device
strap will need to be carefully adjusted for proper
balancing.
8 Remove the external snap rings from the
extension cylinder rod-end pivot pins at the
platform end of the extension tube. Use a soft
metal drift to remove the pins.
9 Support and slide the extension cylinder out
of the base end of the extension tube. Place
the extension cylinder on blocks for support.
Note: During removal, the suitable lifting device
strap will need to be carefully adjusted for proper
balancing.
10 Remove and label the wear pads from the
extension cylinder.
Note: Pay careful attention to the location of each
wear pad.
4-3
Primary Boom Lift Cylinder
The primary boom lift cylinder raises and lowers
the primary boom. The primary boom lift cylinder is
equipped with a counterbalance valve to prevent
movement in the event of a hydraulic line failure.
How to Re mov e th e Prim ary Bo om Lift Cylin der
How to Remove the Primary
Boom Lift Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these
skills and tools could result in
death or serious injury and
significant component damage.
Dealer service is strongly
recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
1 Raise the primary boom enough to access the
primary boom lift cylinder rod-end pivot pin.
2 Raise the secondary boom enough to access
the primary boom lift cylinder barrel-end pivot
pin.
3 Attach a lifting strap from an suitable lifting
device to the primary boom for support. Do
not apply any lifting pressure.
4 Place a block of wood across the upper
secondary boom to support the cylinder when
the rod-end pivot pin is removed.
Содержание Genie Z-34/22
Страница 63: ...October 2021 Service and Repair Manual Manifolds Part No 1268515GT Z 34 22 Bi Energy 51 ...
Страница 85: ...October 2021 Service and Repair Manual 73 Electrical Schematic ANSI CSA from SN Z3414 9686 to Z34F 12065 ...
Страница 88: ...Service and Repair Manual October 2021 76 Electrical Schematic ANSI CSA from SN Z3414 9686 to Z34F 12065 ...
Страница 89: ...October 2021 Service and Repair Manual 77 Electrical Schematic ANSI CSA from SN Z34F 12066 ...
Страница 92: ...Service and Repair Manual October 2021 80 Electrical Schematic ANSI CSA from SN Z34F 12066 ...
Страница 93: ...October 2021 Service and Repair Manual 81 GBOX Switch Panel Wiring Diagram ANSI CSA from SN Z3414 9686 ...
Страница 96: ...Service and Repair Manual October 2021 84 GBOX Terminal Strip Wiring Diagram ANSI CSA from SN Z3414 9686 ...
Страница 97: ...October 2021 Service and Repair Manual 85 PBOX Wiring Diagram ANSI CSA from SN Z3414 9686 ...
Страница 99: ...October 2021 Service and Repair Manual 87 Electrical Schematic CE AS from SN Z3414 9686 to Z34F 12065 ...
Страница 102: ...Service and Repair Manual October 2021 90 Electrical Schematic CE AS from SN Z3414 9686 to Z34F 12065 ...
Страница 103: ...October 2021 Service and Repair Manual 91 Electrical Schematic CE AS from SN Z34F 12066 ...
Страница 106: ...Service and Repair Manual October 2021 94 Electrical Schematic CE AS from SN Z34F 12066 ...
Страница 107: ...October 2021 Service and Repair Manual 95 GBOX Switch Panel Wiring Diagram CE AS from SN Z3414 9686 ...
Страница 110: ...Service and Repair Manual October 2021 98 GBOX Terminal Strip Wiring Diagram CE AS from SN Z3414 9686 ...
Страница 111: ...October 2021 Service and Repair Manual 99 Platform Control Box Wiring Diagram CE AS from SN Z3414 9686 ...
Страница 114: ...Service and Repair Manual October 2021 102 Power Cable Wiring Diagram from SN Z3414 9686 ...
Страница 115: ...October 2021 Service and Repair Manual 103 Drive Contactor Panel Wiring Diagram ...
Страница 116: ...Service and Repair Manual October 2021 104 Z 34 22 Bi Energy Part No 1268515GT Drive Contactor Panel Wiring Diagram ...
Страница 117: ...October 2021 Service and Repair Manual Part No 1268515GT Z 34 22 Bi Energy 105 Manifold and Limit Switch Wiring Diagram ...
Страница 118: ...Service and Repair Manual October 2021 106 Manifold and Limit Switch Wiring Diagram ...
Страница 119: ...October 2021 Service and Repair Manual 107 LVI BCI Option Wiring Diagram ...
Страница 120: ...Service and Repair Manual October 2021 108 Z 34 22 Bi Energy Part No 1268515GT LVI BCI Option Wiring Diagram ...
Страница 121: ...October 2021 Service and Repair Manual Part No 1268515GT Z 34 22 Bi Energy 109 Charger Interlock Option ...
Страница 122: ...Service and Repair Manual October 2021 110 Charger Interlock Option ...
Страница 123: ...October 2021 Service and Repair Manual 111 Engine Wiring Diagram ...
Страница 124: ...Service and Repair Manual October 2021 112 Z 34 22 Bi Energy Part No 1268515GT Engine Wiring Diagram ...
Страница 126: ...Service and Repair Manual October 2021 114 Contact Alarm Option from SN Z34F 12066 ...
Страница 127: ...October 2021 Service and Repair Manual 115 Fuel Level Sensor Option from SN Z34F 12066 ...
Страница 129: ...October 2021 Service and Repair Manual 117 Hydraulic Schematic ...
Страница 131: ......