June 2009
GS-30 • GS-32 • GS-46
Part No. 96316
TABLE OF CONTENTS
Section 3
Rev
Scheduled Maintenance Procedures
, continued
F
Checklist B Procedures
B-1
Inspect the Batteries ........................................................................... 3 - 9
B-2
Inspect the Electrical Wiring ............................................................. 3 - 11
B-3
Inspect the Tires and Wheels (including castle nut torque) ............... 3 - 12
B-4
Test the Emergency Stop ................................................................. 3 - 12
B-5
Test the Key Switch .......................................................................... 3 - 13
B-6
Test the Automotive-style Horn (if equipped) .................................... 3 - 13
B-7
Test the Drive Brakes ....................................................................... 3 - 14
B-8
Test the Drive Speed - Stowed Position ........................................... 3 - 17
B-9
Test the Drive Speed - Raised Position ............................................ 3 - 18
B-10 Perform Hydraulic Oil Analysis ......................................................... 3 - 19
B-11 Inspect the Hydraulic Cap Venting System ....................................... 3 - 19
B-12 Check the Module Tray Latch Components ...................................... 3 - 20
B-13 Inspect the Voltage Inverter (if equipped) ......................................... 3 - 21
B-14 Test the Down Limit Switch and the Pothole Limit Switches ............. 3 - 22
B-15 Test the Up Limit Switch (if equipped) .............................................. 3 - 25
C
Checklist C Procedures
C-1
Test the Platform Overload System (if equipped) ............................. 3 - 26
C-2
Replace the Hydraulic Tank Breather Cap -
Models with Optional Hydraulic Oil ................................................... 3 - 28
C
Checklist D Procedures
D-1
Check the Scissor Arm Wear Pads .................................................. 3 - 29
D-2
Replace the Hydraulic Tank Return Filter ......................................... 3 - 31
B
Checklist E Procedure
E-1
Test or Replace the Hydraulic Oil ..................................................... 3 - 32
viii
Содержание Genie GS-1530
Страница 4: ...September 2005 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank iv ...
Страница 20: ...June 2009 Section 2 Specifications 2 8 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 140: ...October 2008 Section 4 Repair Procedures 4 86 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 144: ...September 2005 Section 5 Fault Codes 5 4 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 155: ...Section 6 Schematics October 2008 Part No 96316 GS 30 GS 32 GS 46 6 11 This page intentionally left blank ...
Страница 159: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 15 This page intentionally left blank ...
Страница 163: ...Section 6 Schematics June 2009 Part No 96316 GS 30 GS 32 GS 46 6 19 This page intentionally left blank ...
Страница 167: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 23 This page intentionally left blank ...
Страница 171: ...Section 6 Schematics October 2008 Part No 96316 GS 30 GS 32 GS 46 6 27 This page intentionally left blank ...
Страница 175: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 31 This page intentionally left blank ...
Страница 179: ...Section 6 Schematics June 2009 Part No 96316 GS 30 GS 32 GS 46 6 35 This page intentionally left blank ...
Страница 196: ...Section 6 Schematics September 2005 6 52 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...