
Section 3 • Scheduled Maintenance Procedures
Part No. 96316
GS-30 • GS-32 • GS-46
3 - 25
June 2009
REV F
B-15
Test the
Up Limit Switch (if equipped)
Genie requires that this procedure be performed
every 250 hours or quarterly, whichever comes
first.
Maintaining the limit switches is essential to safe
operation and good machine performance.
Operating the machine with a faulty limit switch
could result in reduced machine performance and
a potentially unsafe operating condition.
Perform these procedures with the machine on a
firm, level surface that is free of obstructions.
Up Limit Switch (if equipped)
1 Turn the key switch to ground control and raise
the platform approximately 8 feet / 2.4 m from
the ground.
2 Rotate the safety arm away from the machine
and let it hang down.
3 Lower the platform onto the safety arm.
Crushing hazard. Keep hands
clear of the safety arm when
lowering the platform.
4 While raising the platform from the ground
controls, push the arm of the up limit switch
towards the steer end of the machine to
activate the limit switch.
Result: The platform stops raising. The machine
is functioning properly.
Result: The platform continues to raise. Adjust
or replace the up limit switch.
CHECKLIST
B
PROCEDURES
Содержание Genie GS-1530
Страница 4: ...September 2005 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank iv ...
Страница 20: ...June 2009 Section 2 Specifications 2 8 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 140: ...October 2008 Section 4 Repair Procedures 4 86 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 144: ...September 2005 Section 5 Fault Codes 5 4 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...
Страница 155: ...Section 6 Schematics October 2008 Part No 96316 GS 30 GS 32 GS 46 6 11 This page intentionally left blank ...
Страница 159: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 15 This page intentionally left blank ...
Страница 163: ...Section 6 Schematics June 2009 Part No 96316 GS 30 GS 32 GS 46 6 19 This page intentionally left blank ...
Страница 167: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 23 This page intentionally left blank ...
Страница 171: ...Section 6 Schematics October 2008 Part No 96316 GS 30 GS 32 GS 46 6 27 This page intentionally left blank ...
Страница 175: ...Section 6 Schematics September 2005 Part No 96316 GS 30 GS 32 GS 46 6 31 This page intentionally left blank ...
Страница 179: ...Section 6 Schematics June 2009 Part No 96316 GS 30 GS 32 GS 46 6 35 This page intentionally left blank ...
Страница 196: ...Section 6 Schematics September 2005 6 52 GS 30 GS 32 GS 46 Part No 96316 This page intentionally left blank ...